Laserfiche WebLink
Truck Cvcle Time: <br />Truck Exchange Time: 0.50 Minutes <br />Truck Load Time: 0.960 Minutes <br />Truck Maneuver and Dump 0.90 Minutes <br />Time: <br />Adjusted for site altitude: <br />Adjusted for site altitude: <br />Adjusted for site altitude: <br />Page 71 of 340 <br />0.500 <br />Minutes <br />0.960 <br />Minutes <br />0.900 <br />Minutes <br />Truck Travel (Haul & Return) Time: Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, <br />maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade (%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />mm <br />1 <br />2000.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />0.810 <br />2 <br />4000.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />1.416 <br />3 <br />1000.00 <br />10.00 <br />3.00 <br />13.00 <br />834 <br />0.191 <br />Haul Time: 2.417 minutes <br />Return Route: <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade (%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />Loading Tool unit <br />1 <br />1000.00 <br />-10.00 <br />3.00 <br />-7.00 <br />2938 <br />0.410 <br />2 <br />4000.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />1.392 <br />Truck(s) Selected Number of Trucks: <br />4 Truck(s) <br />3 <br />2000.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />0.696 <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />Return Time: 2.498 <br />minutes <br />Total Truck Cycle Time: 7.275 <br />minutes <br />Loading Tool unit <br />Production <br />437.36 <br />LCY/Hour Adjusted for job efficiency: <br />363.01 LCY/Hour <br />Truck Unit Production <br />87.77 <br />LCY/Hour Adjusted for job efficiency: <br />72.85 LCY/Hour <br />Optimal No. of Trucks: <br />5 <br />Truck(s) Selected Number of Trucks: <br />4 Truck(s) <br />Adjusted hourly truck team production: 291.41 <br />LCY/Hour <br />Adjusted single truck/loader team production: 291.41 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 291.41 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 235.64 <br />Hours <br />Unit cost: <br />$1.127 <br />/LCY Total job cost: $77,388 <br />CIRCES Cost Estimating Software <br />