Laserfiche WebLink
Task description: <br />Site: Bowie No. 2 Mine <br />TRUCK/LOADER TEAM WORK <br />Haul Cover Material from Gob Pile #3 to Gob Pile #2 <br />PROJECT IDENTIFICATION <br />Permit Action: RN4 <br />Task #: 045 State: Colorado <br />Date: 3/1/2017 County: Delta <br />7:48:43 AM <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: Generic 10-12 cy, 6x4 <br />-Loader: CAT 950H <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Page 69 of 340 <br />Permit/Job#: C1996083 <br />Abbreviation: None <br />Filename: C083-045 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team SuDDort Eauinment Maintenance Eauinment <br />Total work team cost/hour: $328.41 <br />MATERIAL QUANTITIES <br />Initial volume: 58,943 CCY Swell factor: 1.165 <br />Loose volume: 68,669 LCY <br />Source of estimated volume: Volume IX, Appendix A <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />NA NA <br />NA <br />Ownership cost/hour: <br />$18.29 <br />$25.38 <br />NA <br />NA NA <br />NA <br />Operating cost/hour: <br />$39.97 <br />$28.79 <br />NA <br />NA NA <br />NA <br />%Utilization -riper: <br />NA <br />0 <br />NA <br />NA NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$41.20 <br />NA <br />NA NA <br />NA <br />Unit Subtotals: <br />$58.26 <br />$95.37 <br />NA <br />NA NA <br />NA <br />Number of Units: <br />4 <br />1 <br />0 <br />0 0 <br />0 <br />Group Subtotals: <br />Work: $328.41 <br />Support: $0.00 Maint: $0.00 <br />Total work team cost/hour: $328.41 <br />MATERIAL QUANTITIES <br />Initial volume: 58,943 CCY Swell factor: 1.165 <br />Loose volume: 68,669 LCY <br />Source of estimated volume: Volume IX, Appendix A <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />