Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.90 Minutes <br />0.60 Minutes <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad: 1.000 <br />NA <br />CAT HB <br />Job Efficiency: 0.830 <br />NA <br />CAT HB <br />Page 64 of 340 <br />Site Altitude: 6750 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />00m) <br />Travel Time <br />(min) <br />1 <br />3200.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />1.37 <br />Haul Time: 1.37 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(f m) <br />Travel Time <br />(min) <br />1 <br />3200.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />1.23 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 532.88 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.127 /LCY <br />1.23 <br />minutes <br />4.10 <br />minutes <br />442.29 <br />LCY/Hour <br />2 <br />Scraper(s) <br />442.29 <br />LCY/Hour <br />442.29 <br />LCY/Hour <br />Total job time: 2.18 Hours <br />Total job cost: $1,089 <br />CIRCES Cost Estimating Software <br />