Laserfiche WebLink
Truck Cvcle Time: <br />Truck Exchange Time: 0.50 Minutes <br />Truck Load Time: 0.646 Minutes <br />Truck Maneuver and Dump 0.90 Minutes <br />Time: <br />Adjusted for site altitude: <br />Adjusted for site altitude: <br />Adjusted for site altitude: <br />Page 60 of 340 <br />0.500 <br />Minutes <br />0.673 <br />Minutes <br />0.900 <br />Minutes <br />Truck Travel (Haul & Return) Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 1" tire <br />penetration 4.0 <br />Grade (%) <br />Roll. Res <br />Total Res <br />Haul Route: <br />Travel <br />Loading Tool unit <br />Seg # <br />Haul Distance <br />Grade (%) <br />(%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />215.35 <br />(Ft) <br />178.74 LCY/Hour <br />Optimal No. of Trucks: <br />(%) <br />(%) <br />(fpm) <br />Time <br />500.00 <br />0.00 <br />4.00 <br />4.00 <br />2849 <br />0.201 <br />LCY/Hour <br />mm <br />LCY/Hour <br />JOB TIME AND COST <br />1 <br />500.00 <br />0.00 <br />1 <br />4.00 <br />4.00 <br />2665 <br />0.285 <br />/LCY Total job cost: $261,010 <br />Haul Time: <br />0.285 <br />minutes <br />Return Route: <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Loading Tool unit <br />(Ft) <br />Production <br />(%) <br />(%) <br />(fpm) <br />Time <br />215.35 <br />LCY/Hour Adjusted for job efficiency: <br />178.74 LCY/Hour <br />Optimal No. of Trucks: <br />min <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />1 <br />500.00 <br />0.00 <br />4.00 <br />4.00 <br />2849 <br />0.201 <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />Return Time: 0.201 <br />minutes <br />Total Truck Cycle Time: 2.559 <br />minutes <br />Loading Tool unit <br />Production <br />469.83 <br />LCY/Hour Adjusted for job efficiency: <br />389.96 LCY/Hour <br />Truck Unit Production <br />215.35 <br />LCY/Hour Adjusted for job efficiency: <br />178.74 LCY/Hour <br />Optimal No. of Trucks: <br />2 <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 357.49 <br />LCY/Hour <br />Adjusted single truck/loader team production: 357.49 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 357.49 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 909.13 <br />Hours <br />Unit cost: <br />$0.803 <br />/LCY Total job cost: $261,010 <br />CIRCES Cost Estimating Software <br />