Page 58 of 340 <br />TRUCK/LOADER TEAM WORK <br />Task description: Haul refuse out of Gob Pile #2/#3 drying areas for placement <br />Site: Bowie No. 2 Mine Permit Action: RN4 Permit/Job#: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 040 <br />Date: 3/1/2017 <br />7:41:51 AM <br />State: Colorado <br />County: Delta <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: Generic 10-12 cy, 6x4 <br />-Loader: Cat 345D L 12'-10" Stick <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C083-040 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team SuDDort Eauinment Maintenance Eauinment <br />Total work team cost/hour: $287.10 <br />MATERIAL OUANTITIES <br />Initial volume: 325,000 CCY Swell factor: 1.000 <br />Loose volume: 325,000 LCY <br />Source of estimated volume: Vol XI, p. 4a, Vol IX p 12 -all 225k yds @ #3, 100k yds @ #2 <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />Truck <br />Excavator Load Area <br />Dump Area Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 NA <br />NA NA <br />NA <br />Ownership cost/hour: <br />$18.29 <br />$61.75 NA <br />NA NA <br />NA <br />Operating cost/hour: <br />$39.97 <br />$71.04 NA <br />NA NA <br />NA <br />%Utilization -riper: <br />NA <br />0 NA <br />NA NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />$0.00 NA <br />NA NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 NA <br />NA NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$37.79 NA <br />NA NA <br />NA <br />Unit Subtotals: <br />$58.26 <br />$170.58 NA <br />NA NA <br />NA <br />Number of Units: <br />2 <br />1 0 <br />0 0 <br />0 <br />Group Subtotals: <br />Work: $287.10 Support: $0.00 Maint: $0.00 <br />Total work team cost/hour: $287.10 <br />MATERIAL OUANTITIES <br />Initial volume: 325,000 CCY Swell factor: 1.000 <br />Loose volume: 325,000 LCY <br />Source of estimated volume: Vol XI, p. 4a, Vol IX p 12 -all 225k yds @ #3, 100k yds @ #2 <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />