My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-13_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2017-03-13_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2017 7:54:05 AM
Creation date
3/14/2017 11:21:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
3/13/2017
Doc Name
Cost Estimate
From
DRMS
To
Bowie Resources
Type & Sequence
RN4
Email Name
CCW
JRS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Bowie No. 2 Mine <br />PROJECT IDENTIFICATION <br />Task #: 038 <br />Date: 3/1/2017 <br />7:40:17 AM <br />COMPACTION WORK <br />Material Hauled to Gob Pile #1 <br />Permit Action: RN4 <br />State: Colorado <br />County: Delta <br />Page 54 of 340 <br />Permit/Job#: C1996083 <br />Abbreviation: None <br />Filename: C083-038 <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 825H <br />Horsepower: 354 <br />Compactor Type: Soil - tamping foot <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$103.01 <br />NA <br />Operating Cost/Hour: <br />$74.57 <br />100 <br />Operator Cost/Hour: <br />$26.32 <br />NA <br />Total Unit Cost/Hour: <br />$203.90 <br />Total Fleet Cost/Hour: <br />$203.90 <br />MATERIAL QUANTITIES <br />Loose volume: 14,349 LCY Shrinkage factor: 0.875 <br />Compacted volume: 12,555 CCY <br />Source of estimated volume: Total of all material hauled to Gob Pile <br />Source of estimated shrinkage factor: Cat Handbook <br />HOURLY PRODUCTION Unadjusted hourly production = (W x S x L x C) / P <br />Compacted width per pass (W): 7.34 feet <br />Average Compactor Speed (S): 4.00 mph <br />Compacted thickness of each lift (L): 8.00 inches <br />Conversion Constant (C): 16.3 (5,280ft./12in./27cu.ft.) <br />Required number of machine passes (P): 3 passes <br />Unadjusted Hourly Unit Production: 1,276.18 CCY/hour <br />Job Condition Correction Factors Site Altitude: 6,400 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.8300 multiplier <br />Adjusted Hourly Unit Production: 1,059.23 CCY/Hour <br />Adjusted Hourly Fleet Production: 1,059.23 CCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Compactor(s) Total job time: <br />11.85 Hours <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.