My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-13_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2017-03-13_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2017 7:54:05 AM
Creation date
3/14/2017 11:21:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
3/13/2017
Doc Name
Cost Estimate
From
DRMS
To
Bowie Resources
Type & Sequence
RN4
Email Name
CCW
JRS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 340 <br />106ii <br />106ij <br />106ip <br />106iq <br />106ir <br />106is <br />106it <br />106iu <br />106iy <br />106iz <br />110 <br />111 <br />112 <br />113 <br />115 <br />116 <br />117 <br />118 <br />119 <br />120 <br />121 <br />122 <br />123 <br />124 <br />125 <br />126 <br />127 <br />128 <br />129 <br />130 <br />140 <br />150 <br />151 <br />152 <br />154 <br />155 <br />156 <br />157 <br />165 <br />170 <br />171 <br />Plug and seal DH -58B (aka DH -58A) <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />4 <br />1 <br />4 <br />1 <br />1 <br />1 <br />4 <br />1 <br />1 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />12.00 <br />$3,549.14 <br />$3,011.42 <br />$2,554.87 <br />$2,222.57 <br />$1,940.80 <br />$2,212.44 <br />$3,182.44 <br />$3,112.14 <br />$3,754.82 <br />$3,692.47 <br />$325,205.00 <br />$22,904.00 <br />$19,929.00 <br />$43,697.00 <br />$6,538.00 <br />$1,178.00 <br />$1,422.00 <br />$956.00 <br />$30,937.00 <br />$31,339.00 <br />$11,171.00 <br />$218.00 <br />$41,720.00 <br />$3,495.00 <br />$42,537.00 <br />$199.00 <br />$853.00 <br />$2,499.00 <br />$6,486.00 <br />$128.00 <br />$146,660.40 <br />$479,958.00 <br />$108,730.00 <br />$81,262.00 <br />$108,587.00 <br />$1,573.00 <br />$262.00 <br />$57,403.00 <br />$1,627,822.97 <br />$675.00 <br />$128,708.80 <br />Plug and seal CWI-DH-60 (aka Mon Well) <br />BOREHOLE <br />12.00 <br />Plug and seal DH -67B <br />BOREHOLE <br />10.00 <br />Plug and seal DH -67-D <br />BOREHOLE <br />9.00 <br />Plug and seal DH-67-Abv <br />BOREHOLE <br />8.00 <br />Plug and seal DH-67-B1w <br />BOREHOLE <br />9.00 <br />Plug and seal CWI-DH-69 (aka B-1 Mon Well) <br />BOREHOLE <br />12.00 <br />Plug and seal CWI-DH-70 (aka B-1 Mon Well) <br />BOREHOLE <br />11.00 <br />Plug and seal 2010-1B <br />BOREHOLE <br />12.00 <br />Plug and seal 2010 -ISS <br />BOREHOLE <br />12.00 <br />Replace Topsoil from Stockpile A to Portal/Utility <br />Bench <br />SCRAPERI <br />652.39 <br />Replace Topsoil from Stockpile A to Truck <br />Loadout/Coal Stkpl <br />SCRAPERI <br />45.95 <br />Replace Topsoil from Stockpile F to Train Loadout <br />SCRAPER1 <br />39.98 <br />Replace Topsoil from Stockpile A to B -Seam <br />Portal Bench <br />SCRAPERI <br />87.66 <br />Replace Topsoil fm Stockpiles C/D to Pond C and <br />Gob Pond D <br />SCRAPERI <br />13.12 <br />Replace topsoil from Stockpile to Pond F <br />DOZER <br />3.95 <br />Replace topsoil from Stockpile F to Pond J <br />SCRAPERI <br />2.85 <br />Replace topsoil from Stockpile F to Pond K <br />SCRAPERI <br />1.92 <br />Replace topsoil fm stockpile to MR/TR Light -Use <br />Roads <br />DOZER <br />25.96 <br />Replace topsoil from stockpiles to MR/TR drill <br />pads <br />DOZER <br />27.04 <br />Replace topsoil from Stockpile A to Prep Plant <br />Bench <br />SCRAPERI <br />22.41 <br />Replace topsoil from stockpile to Material Storage <br />Area <br />DOZER <br />0.18 <br />Replace topsoil from Stockpile E to Gob Pile #2 <br />SCRAPER1 <br />83.69 <br />Replace Topsoil from Stockpile D to Gob Pile #4 <br />SCRAPER1 <br />7.01 <br />Replace topsoil from stockpile to Gob Pile #3 <br />SCRAPER1 <br />85.33 <br />Replace topsoil from stockpile to Haul Road <br />DOZER <br />0.17 <br />Replace topsoil from stockpile to Water Tank <br />Bench <br />SCRAPERI <br />1.71 <br />Replace topsoil from Stockpile G to TR35 <br />road/pad <br />SCRAPERI <br />5.01 <br />Replace topsoil from stockpile to Borrow Area <br />DOZER <br />5.44 <br />Replace topsoil fm stockpile to Upper Parking Lot <br />Expansion <br />DOZER <br />0.46 <br />Seal Portals and Shafts <br />MINESEAL <br />40.00 <br />Drill Seed Mix 3 on Disturbed Area <br />REVEGE <br />225.02 <br />Drill Seed Drill Pads <br />REVEGE <br />82.97 <br />Drill Seed Lt -Use Roads to Drill Pads and Terror <br />Creek <br />REVEGE <br />62.01 <br />Broadcast Seed Mix 3 on Gob Pile #3 <br />REVEGE <br />60.63 <br />Drill seed Hubbard Creek Vent Shaft Pad <br />REVEGE <br />1.20 <br />Drill Seed Rock Laydown Area <br />REVEGE <br />0.50 <br />Weed Control Over 10 -Year Liability Period <br />REVEGE <br />400.00 <br />Demolish and Remove all Structures <br />DEMOLISH <br />160.00 <br />Proctor Testing of Backfill (5 tests) <br />SITEMAINT <br />ENANCE <br />0.00 <br />Nuclear Density Testing of Backfill <br />SITEMAINT <br />ENANCE <br />0.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.