Laserfiche WebLink
W <br />EO <br />X <br />lb) Please provide an estimate of the actual costs to reclaim the site based on what it would <br />cost the State of Colorado using an independent contractor to complete recla-matii,n. The <br />Office adds up to an additional maximum eighteen and one half (18.5%) percent of that <br />total, which includes a private contract, typical overhead cosis and profit. <br />Direct Cost: <br />i. Backfilling: T _ <br />ii. Gradint,' <br />(cubic yards) X $-- _— __ (cost per yard) = Total $ _ -- <br />(cubic yards) X $Y R -.. (cost per yard) = Total $ _ <br />iii. 'rop�a: — -- (cubic Yards) X $ - - (coiI per yard) --'Total $ _ -- <br />iv. Seeding: (acres) X $ __ . (cost per acre) =: Total $ _ <br />v. Mobilization: � � (Pieces of equipment) X $ � (cost per equipment) <br />Total $ <br />Direct Cost Subtotal: $ <br />Division's total overhead cost: X 18.5% <br />Division's Total cost_ $ <br />Note: Based on the Division's experience the required financial warranty is normally set at <br />approximately $2,500 per acne- 'TliereI'WC, ;i typical S acre permit will have a total required financial <br />warranty in the of $12,500. <br />