Laserfiche WebLink
Colowyo Coal Company L.P. <br />IV. Phase III Areas Summary of Reclamation and Management <br />A. General Description <br />As shown on Map 2, each area requested for bond release is comprised of smaller units, which <br />correspond to the specific year that backfilling, grading and reseeding was performed. The work <br />completed includes regrading to the approved post -mining topography, topsoil replacement, and <br />seeding with the approved seed mix. Grading and topsoil replacement was generally performed <br />in the summer and fall months and seeding occurred in the fall. The following table presents <br />when each reclamation parcel was regraded, topsoiled, and seeded. <br />Area <br />Total Acres <br />Regraded <br />(Year) <br />Topsoiled <br />(Year) <br />Seeded <br />(Year) <br />16002* <br />6.2 <br />1993 <br />1993 <br />1993 <br />16003 <br />25.9 <br />1993 <br />1993 <br />1993 <br />16005* <br />3.9 <br />1994 <br />1994 <br />1994 <br />16006 <br />50.5 <br />1994 <br />1994 <br />1994 <br />16008 <br />41.2 <br />1995 <br />1995 <br />1995 <br />16009* <br />1.3 <br />1996 <br />1996 <br />1996 <br />16010 <br />10.0 <br />1996 <br />1996 <br />1996 <br />16011* <br />6.2 <br />1997 <br />1997 <br />1997 <br />16012* <br />2.0 <br />1997 <br />1997 <br />1997 <br />16013* <br />3.2 <br />1997 <br />1997 <br />1997 <br />16014 <br />7.4 <br />1998 <br />1998 <br />1998 <br />16015* <br />2.0 <br />1998 <br />1998 <br />1998 <br />16016* <br />22.7 <br />1999 <br />1999 <br />1999 <br />*Phase II bond release is being applied for under SL -12 application. <br />As noted in the above table, each of these reclamation parcels have met the minimum ten year <br />liability period in accordance with Rule 3.02.3(2)(b). <br />In accordance with the criteria set forth in the "Guideline Regarding Selected Coal Mine Bond <br />Release Issues", issued April 18, 1995, no rill and gully repair has occurred on any of the areas <br />applied for under this application in the last five years. This has been demonstrated through <br />Colowyo's annual rill and gully reports which are on file with Division. <br />No sediment control structures associated with these reclamation parcels are being requested to <br />be released under this application. <br />Phase I bond release has been achieved on all parcels being applied for under this application. <br />Phase II bond release has been granted on several parcels already, and the others as noted on the <br />table below and being applied for Phase II under this application. The below table provides a <br />bond release history for each reclamation parcel included in this application. <br />SL -10 Phase III Bond Release Application <br />