My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-10_REVISION - C1981041
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2017-03-10_REVISION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 7:22:00 AM
Creation date
3/13/2017 6:51:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
3/10/2017
Doc Name
Application
From
Snowcap Coal Company
To
DRMS
Type & Sequence
SL10
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snowcap Coal Company, Inc. -7- 2016 Annual Reclamation Report <br />12. South Fan - Overburden stockpiles 10 and 11, south fan borrow area and <br />portion of access road no. 3. Reference map SLA 6-009. Phase I Bond <br />Release was approved on 0.9 acres with SL -2 on October 27, 2003. <br />Phase II & III Bond Release was approved on 0.9 acres with SL -8 on <br />November 14, 2015. Located in the NEA Section 2, T11 S, R98W, 6th <br />P.M. <br />Area - 0.9 acres <br />Date - October 2000 <br />Seed Mix - "Seed Mix, Table 14-6" <br />Phase III Bond Release — 0.9 acres <br />13. 2 West Portals - Portals & Overburden stockpile 13. Reference Exhibit <br />58. The two steep sloped portal areas were extensively roughened and <br />re -seeded due to poor establishment of vegetation from the 2000 seeding. <br />Phase I Bond Release was approved on 0.3 acres with SL -2 on October <br />27, 2003. Phase II & III Bond Release was approved on 0.3 acres with <br />SL -8 on November 14, 2015. Located in the NE%, Section 11, T11S, <br />R98W, 6th P.M. <br />Area - 0.3 acres <br />Date - October 2000; (0.2 acres re -seeded in October 2005) <br />Seed Mix - "Seed Mix, Table 14-6"; (Re -seed "Salt Tolerant Seed Mix, <br />Table 14-15") <br />Phase III Bond Release — 0.3 acres <br />14. North Decline Mine Dewatering System - Permanent Mine Dewatering <br />Point installed and reclaimed during 2002. Phase I Bond Release was <br />approved on 0.5 acres with SL -2 on October 27, 2003. Phase II & III Bond <br />Release was approved on 0.5 acres with SL -8 on November 14, 2015. <br />Located in EY2NE% and NE%SE%, Section 34, T10S, R98W, 6th P.M. <br />Area - 0.5 acres <br />Date - April 2002 <br />Seed Mix - "Seed Mix, Table 14-13", Upland Components <br />Phase III Bond Release — 0.5 acres <br />15. Roadside Refuse Borrow Area - Area east of the Roadside Refuse Pile <br />excavated during 2002 for cover material for the Roadside Refuse Pile. <br />Phase I Bond Release was approved on 4.5 acres with SL -2 on October <br />27, 2003. Phase II Bond Release on 4.5 acres and Phase III Bond <br />Release on 3.4 acres were approved with SL -8 on November 14, 2015. <br />Located in SE% Section 34, T1 OS, R98W, 6th P.M. <br />Area — 4.5 acres <br />Date - November 2002 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />Phase III Bond Release — 3.4 acres <br />16. Roadside Refuse Disposal Area (including new Upper Diversion <br />
The URL can be used to link to this page
Your browser does not support the video tag.