My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-10_REVISION - M2014042
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2014042
>
2017-03-10_REVISION - M2014042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:02:07 PM
Creation date
3/10/2017 2:01:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014042
IBM Index Class Name
REVISION
Doc Date
3/10/2017
Doc Name
Application
From
Russell Painter
To
DRMS
Type & Sequence
CN1
Email Name
ERR
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Project Description. Describe all aspects of the operation including mining, milling, and exploration methods, materials, <br /> equipment. workforce, construction and operation schedule. power requirements, how clearing will be accomplished. topsoil <br /> stockpile. waste rock placement, tailings disposal. proposed number of driilholes and depth, depth of proposed suction <br /> dredgsng, and how gravels will be replaced, etc Calculate production rates of ore Include justification and calculations for <br /> settling pond capacities and the size of runoff diversion channels. <br /> I plan to excavate seven trenches, totalling to 3.5 acres of disturbance.Work will consist of one 0.5 acre work area per <br /> claim(100'x 100) and only one excavation will be open at one time. I will move overburden and topsoil to mapped <br /> locations using a skid steer and mid-sized track hoe Will use a net with stakes for dig sites near the creek in order to <br /> stop any debris from impacting the creek. I also plan to have one 10'x 10'test hole per claim per, per season. <br /> D. Equipment and Vehicles. Describe that which is proposed for use in youroperabon(Examples:driff dozer, wash plant,mitt.etc) Include. <br /> sizes capec.ty fregoencyofuse,etc <br /> Mechanized Equipment: <br /> • One(1)medium track hoe-John Deere 150D—10.5 wide,track to track; <br /> • One(1) New Holland 785 skid steer. <br /> • Two(2) passenger vehicles on site. <br /> • Possible use of 4-wheeler. <br /> Non-mechanized equipment: <br /> • Hand tools. <br /> E. Structures. Include information about fixed or portable structures or facilities planned for the operation. Show locations on the <br /> map. Include such things as living quarters, storage sheds,mill buildings, thickener tanks. fuel storage,powder magazines, <br /> pipelines, water diversions, trailers,sanitation facilities including sewage disposal etc. Include engineering design and geotechnical <br /> information for project facilities,justification and calculations for sizing of tanks,pipelines and water diversions: etc <br /> A 24 ft.trailer will be kept at the intersection of NFSR 201 and NFSR 755, near Amazonite 5 &7. The trailer will be <br /> removed when not operating. <br /> V. ENVIRONMENTAL PROTECTION MEASURES(SEE 36 CFR 228.8) <br /> A, Air Quality. Describe measures proposed to minimize impacts on air quality such as obtaining a burning permit for slash disposal <br /> or dust abatement on roads. <br /> There is no air quality impact. Only slight dust and diesel fumes will be created. <br /> rrfmore%pace is needed to fill out a block ofinformation.use additional sheets and anach form/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.