My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-10_REVISION - M2014042
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2014042
>
2017-03-10_REVISION - M2014042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:02:07 PM
Creation date
3/10/2017 2:01:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014042
IBM Index Class Name
REVISION
Doc Date
3/10/2017
Doc Name
Application
From
Russell Painter
To
DRMS
Type & Sequence
CN1
Email Name
ERR
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D-Reclamation Plan <br /> Rule 6.3.4 (Starts on Page 139 of the Rules) <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br /> used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br /> lands. This plan must be correlated to Exhibit E -Map. <br /> 1) Primary future(Post-mining)land use(check one): <br /> Cropland(CR) F1 Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) nV Forestry(FR) Wildlife Habitat(WL) <br /> Residential (RS) -a Recreation (RC) Industrial/Commercial(IC) <br /> 2) Please provide a general description of how the mined area will be Reclaimed: <br /> Overburden put back topsoil next then grass seed and add trees to area <br /> 3) What will the final grade of the reclaimed slopes(Horizontal:Vertical): H: V <br /> (Note: If the Applicant proposes slopes steeper than 311: 1 V(example 1 H:1 V,2H: 1 V, etc.),please <br /> include a Justification: <br /> TRY TO PL>'T BACK TO ORIGINAL SJOPE AS BEST I CAN <br /> a. Please provide a general description of the backfilling.and grading: <br /> Overburden first then TOPSOIL then trees and grass <br /> 4) De th of topsoil to be salvaged (only for surface disturbances) (check one): <br /> ✓ 4-6 inches F_6-8 inches <br /> 8-10 inches �_ 10-12 inches <br /> Other: <br /> _� N/A, explain: <br />
The URL can be used to link to this page
Your browser does not support the video tag.