Laserfiche WebLink
EXHIBIT C -Mining Plan <br /> Rule 6.3.3 (Starts on Page 136 of the Rules) <br /> The purpose of the mining plan is to describe how mining will affect the permit area through duration of the <br /> operation. The plan must be correlated to Exhibit E-Map. <br /> W <br /> 1) Estimated dates of commencement: N A ;0 17and completion: Z may/ <br /> 2) How many years is the mine anticipated to be operational: 10 years <br /> 3) Will mining activities occur all-yearlong or just seasonally when weather permits (check one): <br /> (f:[) all-yearlong or (]Zb seasonally, explain: April 01 to Oct 31 <br /> 4) How many aces of the mine site will be disturbed at any given time: 10 acres <br /> 5) Depth of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches 6-8 inches <br /> 8-10 inches 10-12 inches <br /> Other: <br /> F N/A, explain: <br /> 6) Will you need to move any overburden (check one): (F✓ )Yes or�(�)No <br /> a. If yes, approximately how thick is the overburden? 15 feet <br /> 7) How will the mine be accessed: (P'l ) existing roads (_a) new roads will be created <br /> Please describe the existing roads: <br /> roads made 1950s some by other miners <br /> a. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements: <br /> no <br /> 8) Will water be needed during the mining operation (check one): Yes or(-a)No <br /> a. If yes, please describe the source of the water and how much water will be used during the <br /> operation: <br /> 9) Will any water diversions or impoundments be constructed (check one): Yes or(�✓ )No <br /> a. If yes, please describe the water diversions or impoundments: <br /> 10)Will any chemicals be used during the mining process (check one): (-a)Yes or No <br /> a. If yes, please describe the chemical types and quantities to be utilized, chemical storage and <br /> spill containment and emergency response plans for on-site spills. Plant operation details <br /> should include tank capacities and operating solution volumes: <br />