6. Water Handling <br />Water handling at the Fairplay Au Pit will be constant throughout the mine's life. Due to the nature <br />of the deposit being mined, cobbles and gravels are highly permeable, yet clay units will retain and <br />balance water. Groundwater may be encountered during mining, but is not likely. The water table, <br />based on neighboring wells, is close to an elevation of 9970'. This is 50 feet below the previously <br />mined area in Phase I, and 100 feet below the remainder of Phase 1 as well as Phases 2 and 3. The <br />operator has never encountered groundwater in the current 110 permit area. In the event that it is <br />encounter, it will be dewatered to the Platte River. This is the only discharge that the site will have. <br />The mining plan creates a mine with more than enough depth to allow full containment of the 100 <br />YR event (2.86 inches) in the disturbed areas. No portions of the mine disturbance will be allowed <br />to drain offsite. All surface water will either evaporate or infiltrate. No surface water discharge will <br />be needed. <br />7. Schedule of Operations <br />The Fairplay Au Pit will process material 6 days per week (Monday -Saturday) on a year-round <br />basis. Material processing will occur from either sunrise to sunset or 7AM-7PM with a I hour <br />warm up period prior if necessary, whichever is longer. Repairs to equipment will typically take <br />place during daylight hours but if necessary emergency repairs may occur in the evening. All <br />lighting associated with maintenance will be downcast. <br />To mitigate the impacts to the community, all 24-hour activities will occur within the processing <br />area, except for trucking. <br />8. Import Materials <br />Fill material may be accepted into the mine site. Fill material will be spread out on the mine floor or <br />stockpiled and will be blended into the final landscape. Some material may also be re -sold as <br />construction material. None of this material can be accepted by the Operator unless the attached <br />form is filled out by the entity bringing the material to the site. The form provides an assurance that <br />all material brought to the site is inert and has no toxic or acid forming material above acceptable <br />limits. <br />Fairplay Ait Pit March 2017 D-8 Gnz LcwkU.paAnocistm r:a.c <br />