My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-27_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2017-01-27_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 9:37:01 AM
Creation date
3/9/2017 9:25:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
1/27/2017
Doc Name
Application
From
Twentymile Coal, LLC
To
DRMS
Type & Sequence
MR303
Email Name
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3/9/2017 State.co.us Executive Branch Mail - Fwd: Twentymile Coal, LLC - Foidel Creek Mine, MR17-303 Resubmittal <br />'ATE E DRMS CoalAdmin - DNR, DNR <dnr_drms coaI_adrniin@state.co.us> <br />IL.R� <br />C ADO, — — — <br />Please add to laserfiche MR303 C1982056 file. <br />---------- Forwarded message ---------- <br />From: Nettleton, Jerry <JNettleton@peabodyenergy.com> <br />Date: Fri, Jan 27, 2017 at 10:53 AM <br />Subject: Twentymile Coal, LLC - Foidel Creek Mine, MR17-303 Resubmittal <br />To: "tabetha.lynch@state.co.us" <tabetha.lynch@state.co.us> <br />Tabetha — <br />Based on our conversation about the incorrect MR number designation for this revision, I have gone back and corrected <br />the submittal materials to reflect the corrected designation (ie: MR17-304 corrected to MR17-303). Attached is a pdf of <br />the corrected submittal package for your file. <br />I also reviewed the Reclamation Cost Estimate. As you indicated, the CDRMS estimate is about $1,000 more than our <br />initial estimate ($1,113). In doing a side-by-side comparison, I noted that our numbers for the actual project costs were <br />almost identical ($3,676 — TC/$3,639-CDRMS). The difference lies in the "Overhead and Profit" and "Administrative" <br />costs ($294-TC/$1,444-CDRMS). The CDRMS number for these costs is about 28% of the calculated "Total Bond <br />Amount", which seems excessive. I would ask that you review the CDRMS cost estimate for reasonableness, <br />specifically; 1) Given the limited scope and nature of the required work, is a Job Superintendent necessary ($329.20); <br />and 2) The figure of $500 for "Financial warranty processing" seems like an unnecessary add-on, or at a minimum, <br />excessive for the job size? <br />We appreciate your consideration and assistance as we move forward to finalize this revision. Please feel free to <br />contact me with any further questions, or to discuss — <br />Best regards, <br />Jerry <br />Jerry M. Nettleton <br />Manager Environmental Affairs <br />Twentymile Coal, LLC <br />https://m ai I . googl e. com/mail/b/511 /u/0/?ui =2&i k=deb7fOcd20&view= pt&search= i nbox&th=15aa5ac63089319d&si m 1= 15aa5ac63089319d 1/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.