Laserfiche WebLink
0 <br /> I <br /> \ EXISTING 5 DAM <br /> SURGE RISER PIPE 1 <br /> EXISTING <br /> LATERAL UNDERDRAIN <br /> t <br /> (TYPICAL) <br /> \ EXISTING \ f <br /> SEEPWATER <br /> PIPELINE <br /> EXISTING <br /> O \ OVERHEAD <br /> \ ELECTRIC <br /> EXISTING 5 DAM PRO <br /> EXISTING \ \ SEEPWATER PUMPBACK SEE A <br /> OVERHEAD f PIPELINE.: - PIPEL E <br /> ELECTRIC \ <br /> O O '•. <br /> PROPOSED <br /> ,./ MANHOLES <br /> (TYPICAL) <br /> 01 EXISTING <br /> OVERHEAD <br /> ELECTRIC <br /> O flfl O <br /> RETURN PIP L <br /> E STING <br /> 0 L <br /> - O fl0 O 0 E <br /> O <br /> O <br /> Q O C3 Q <br /> �\Q Ofl <br /> \ ,O Cb Q fl <br /> O' O + + 00 <br /> REVISIONS NOTICE SCALE: SHEET SIZE DIVISION: <br /> NO. BY DATE DESCRIPTION <br /> DO Nor SCALE DRAWING. THIS IS A COMPU"FER 1"=150'-0" ANSI B MILL ENGINEERING <br /> GENERATED DRAWING.ALL CIIANGES IIERIN SHALL DWN BY: DATE: AREA: MAYFLOWER JOB NO. <br /> BE PERFORMED USING CADD ONLY.DO NO"C CHANGE DTO 04/29/13 cumd3jiMolybdenum <br /> MANUALLY."11IIS DRAWING IS THE PROPERFY OF AND '= TITLE: DWG.NO. <br /> EMBODIES PROPRIETARY INFORMA770N BELONGING CHKD BY: DATE: =>- ® MAYFLOWER 877-C-GA-100 <br /> TO EMI CORPORATION AND MUST BE RETURNED A Freeport-McMoRan Company 5 DAM TOE DRAIN REPAIR CAD NO. <br /> IMMEDIATELY UPON REQUEST. IT MUS"t NOT BE ENGD BY: DATE: <br /> COPIED IN WHOLE OR IN PAR"t, NOR DISCLOSED TO TMR 04/29/13 OVERALL SITE PLAN REVISION: <br /> THIRU PARTIES WITHOUT 171E WRI"P"PEN PERMISSION APVD BY: DATE:OF FMI CORPORA CLIMAX OPERATIONS <br /> TION. <br /> SHT. 1 11 <br />