Laserfiche WebLink
-4- <br />l2. Primary future (Post-mininQ)_land use (check one): <br />Cropland(CR) Pastureland{PL) <br />.II Rangeland(RL) � Forestry(FR) <br />Residential(RS) � Recreation(RC) <br />Developed Water Resources(WR) <br />13. Primnry present land use (check one): <br />El Cropland(CR) '� Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />IndustriaVCommercial(1C) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife liabitat(WL) <br />t—I <br />Industrial.-Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Dozer, Loader, Belly dumps <br />15. On Site Processing: —0 Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />List any designated chemicals or acid -producing materials to be used or stored within permit area: <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />This amendment adds a new access road to the rima mining site and clarifies what work will <br />take place in Surveyor Creek. <br />