Laserfiche WebLink
EXHIBIT G -Water Information <br />The operation is not expected to affect surface or groundwater systems. This project will <br />not have any water requirements for its operation. The only surface water would be <br />drainage that occurs because of a heavy rainfall. Rainfall in the area averages 16.8 inches <br />per year. The site will generally not be impacted by water. <br />Mining specified in the 2013 Amendment was to be north of Surveyor Creek and in the <br />northeast comer of the outlined boundary in the S 112 of Section 11. The area affected is <br />outside the banks of Surveyor Creek. <br />To retain stability of the affected area and prevent storm water runoff from entering the <br />Survey Creek, mining will be from south to north, pushing all material into a stockpile <br />near the actual truck parking area closest to the pit entrance. This will create a natural <br />berm along the south end of the mined area. Lying at the top of the north and east banks <br />of the Surveyor Creek, it will act as a dam for storm water runoff. <br />