Laserfiche WebLink
Task description: Total <br />Site: New Horizon Mine <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />ible Bond for 111.4 ac SL -15 <br />Permit Action: SL15Total <br />Task #: 000 State: Colorado <br />Date: 3/7/2017 County: Montrose <br />User: JDM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C1981008 <br />Abbreviation: None <br />Filename: C008-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />041 <br />046 <br />049 <br />068 <br />069 <br />097 <br />30D <br />Replace topsoil on 1.76 acre area <br />SCRAPERI <br />2 <br />2 <br />2 <br />1 <br />1 <br />1 <br />2 <br />1.84 <br />$2,864.00 <br />$43,030.00 <br />$19,365.00 <br />$9,014.00 <br />$24,459.00 <br />$37,272.90 <br />$296,601.00 <br />Replace topsoil on 22.7 acre area E Sec 31 <br />SCRAPERI <br />27.58 <br />Replace topsoil on 5.45 and 10.36 acre areas NW <br />Sec 6 <br />SCRAPERI <br />12.41 <br />Drill seed Irrigated Pasture Grass - No Release <br />REVEGE <br />28.84 <br />Drill seed Dryland Pasture - No Release <br />REVEGE <br />82.50 <br />Irrigation of 28.8 acres <br />SITEMAINT <br />ENANCE <br />0.00 <br />Replace topsoil on 64.3 ac Lloyd/Benson property <br />Zone 6 <br />SCRAPERI 1 <br />188.05 <br />SUBTOTALS: <br />341.22 <br />$432,606 <br />INDIRECT COSTS <br />$8,738.64 <br />OVERHEAD AND PROFIT: <br />$4,542.36 <br />Liability insurance: <br />2.02 <br />Performance bond: <br />1.05 <br />Job superintendent: <br />170.61 <br />Profit: <br />10.00 <br />Total = <br />$8,738.64 <br />Total = <br />$4,542.36 <br />Total = <br />$12,463.06 <br />Total = <br />$43,260.60 <br />TOTAL O & P = <br />$69,004.66 <br />CONTRACT AMOUNT (direct + O & P) = <br />$501,610.66 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 <br />Engineering work and/or contract/bid preparation: 4.61 <br />Reclamation management and/or administration: 3.58 <br />K�LY�►[�'1 �l�[��I�III <br />Total = 0.00 <br />Total = $23,124.25 <br />$17,957.66 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $110,086.57 <br />TOTAL BOND AMOUNT (direct + indirect) = $542,692.57 <br />