Laserfiche WebLink
South Platte Combined Replacement Plan <br />March 1, 2017 <br />Page 14 of 19 <br />Conditions of Approval <br />I hereby approve this substitute water supply plan, in accordance with 5 37-90-137(11), <br />C.R.S., subject to the following conditions: <br />1. This SWSP shall be valid for the period of January 1, 2017 through December 31, 2017, unless <br />otherwise revoked or superseded by decree. Should a request for renewal of this plan be <br />needed, such renewal request must be submitted to this office with the statutory fee <br />(currently $257 per pit) no later than October 1, 2017. <br />2. The Applicant must contact the District 2 Water Commissioner to arrange a field <br />inspection of the South Platte Operations. <br />3. Well permits have been obtained for the current use and exposed pond surface area of each <br />gravel pit in accordance with 5 37-90.137(2) and (11), C.R.S., as identified in Table A of this <br />approval. <br />4. The total area of pond surface exposed after December 31, 1980 for each of the pits shall not <br />exceed those values listed in Table A of this approval. Should the total surface area exposed <br />exceed those amounts, an amendment will need to be filed with this office. <br />5. The total amount of ground water to be consumed at each of the pits shall not exceed the <br />values listed in Table C of this approval. Total consumption at each pit must not exceed <br />these amounts unless an amendment is made to this plan. <br />6. Approval of this plan is for the purposes as stated herein. This office must first approve any <br />additional uses for the water. Any future additional historic consumptive use credit given <br />(e.g., agricultural water transfer) for these sites must consider all previous credits given. <br />7. All releases of replacement water must be sufficient to cover all out -of -priority depletions in <br />time, place, and amount and must be made under the direction and/or the approval of the <br />water commissioner(s). If approved prior, the release of replacement water may be <br />aggregated to maximize beneficial use. The water commissioner(s) and/or the division <br />engineer shall determine the rate and timing of an aggregated release. <br />8. During times when the Greeley No. 3 Canal is calling for water, Aggregate is not permitted to <br />use the water released from the Everist Star Reservoir as a replacement source for depletions <br />from the W.W. Farms Pit. If Aggregate's Whitney Ditch shares are insufficient or unable to <br />replace depletions associated with the W.W. Farms Pit above the Greeley No. 3 Canal when it <br />Office of the State Engineer <br />1313 Sherman Street, Room 821, Denver, CO 80203 P 303.866.3581 <br />www. water. state. co. us <br />ftiw° q <br />ftiz @ia;�'jtr , <br />{� gQ <br />r <br />All <br />Bonded for backfilling. Lagged and future <br />depletions from evaporation and consumptive use by <br />Distel Pit <br />Ground Water Lake <br />$1,483,800 <br />1,2 <br />wetlands vegetation at the site covered under City <br />of Longmont augmentation plan decreed in case no. <br />2009C W271. <br />Tull Pit <br />Lined Reservoir <br />$2,947,600 <br />1, 3 <br />Bonded for lining. Conditional water storage right <br />decreed in case no. 1994CW062. <br />Lined <br />Conditional water storage right and plan for <br />W -W. Farms Pit <br />Reservoir/ Ground <br />$155,480 <br />2 <br />augmentation for evaporation from up to 66 acres of <br />Water Lakes <br />water surface area decreed in case no. 1990CW23 <br />(site currently exposes 36 acres). <br />Inadequate bond. Applicant is actively working <br />F -Street Pit <br />Ground Water Lake <br />$71,404 <br />1 or 3 <br />towards settling legal matters pertaining to long- <br />term replacement source with the land owner. <br />Conditions of Approval <br />I hereby approve this substitute water supply plan, in accordance with 5 37-90-137(11), <br />C.R.S., subject to the following conditions: <br />1. This SWSP shall be valid for the period of January 1, 2017 through December 31, 2017, unless <br />otherwise revoked or superseded by decree. Should a request for renewal of this plan be <br />needed, such renewal request must be submitted to this office with the statutory fee <br />(currently $257 per pit) no later than October 1, 2017. <br />2. The Applicant must contact the District 2 Water Commissioner to arrange a field <br />inspection of the South Platte Operations. <br />3. Well permits have been obtained for the current use and exposed pond surface area of each <br />gravel pit in accordance with 5 37-90.137(2) and (11), C.R.S., as identified in Table A of this <br />approval. <br />4. The total area of pond surface exposed after December 31, 1980 for each of the pits shall not <br />exceed those values listed in Table A of this approval. Should the total surface area exposed <br />exceed those amounts, an amendment will need to be filed with this office. <br />5. The total amount of ground water to be consumed at each of the pits shall not exceed the <br />values listed in Table C of this approval. Total consumption at each pit must not exceed <br />these amounts unless an amendment is made to this plan. <br />6. Approval of this plan is for the purposes as stated herein. This office must first approve any <br />additional uses for the water. Any future additional historic consumptive use credit given <br />(e.g., agricultural water transfer) for these sites must consider all previous credits given. <br />7. All releases of replacement water must be sufficient to cover all out -of -priority depletions in <br />time, place, and amount and must be made under the direction and/or the approval of the <br />water commissioner(s). If approved prior, the release of replacement water may be <br />aggregated to maximize beneficial use. The water commissioner(s) and/or the division <br />engineer shall determine the rate and timing of an aggregated release. <br />8. During times when the Greeley No. 3 Canal is calling for water, Aggregate is not permitted to <br />use the water released from the Everist Star Reservoir as a replacement source for depletions <br />from the W.W. Farms Pit. If Aggregate's Whitney Ditch shares are insufficient or unable to <br />replace depletions associated with the W.W. Farms Pit above the Greeley No. 3 Canal when it <br />Office of the State Engineer <br />1313 Sherman Street, Room 821, Denver, CO 80203 P 303.866.3581 <br />www. water. state. co. us <br />ftiw° q <br />ftiz @ia;�'jtr , <br />{� gQ <br />r <br />All <br />