My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-02_HYDROLOGY - M1999034
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1999034
>
2017-03-02_HYDROLOGY - M1999034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 9:34:47 AM
Creation date
3/6/2017 1:06:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999034
IBM Index Class Name
Hydrology
Doc Date
3/2/2017
Doc Name
Substitute Water Supply Plan
From
DWR
To
Applegate Group, Inc./ Aggregate Industries
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
South Platte Combined Replacement Plan <br />March 1, 2017 <br />Page 15 of 19 <br />is calling, Aggregate is required to make replacements above the headgate for the Greeley <br />No. 3 Ditch by trucking water from the Everist Star Reservoir or otherwise acquiring an <br />alternate replacement source. <br />9. Conveyance loss for delivery of replacement water is subject to assessment and modification <br />as determined by the division engineer. The distance for assessment of conveyance loss will <br />be based upon DWR stream miles or as approved by the Water Commissioner, and will be <br />assessed from the point of release to the point of depletion/ replacement. <br />10. The replacement water, which is the subject of this plan cannot be sold or leased to any <br />other entity. As a condition of subsequent renewals of this substitute water supply plan, the <br />replacement water must be appurtenant to these sites until a plan or plans for augmentation <br />are obtained. All replacement water must be concurrent with depletions in quantity, timing, <br />and locations. According to an affidavit dated February 29, 2012, the Applicant dedicated the <br />13.5 shares of the Whitney Ditch Company and 96 shares of the Fulton Irrigating Ditch <br />Company as replacement water solely for this SWSP for as long as there are depletions at <br />these gravel pit sites or until such time as another replacement source is obtained. For the <br />purposes of this SWSP, this affidavit will be accepted for the dedication of the shares; <br />however, if the State Engineer determines that a different affidavit or dedication process is <br />necessary to assure proper dedication of the shares, additional information may be required <br />prior to future SWSP approvals. <br />11. All diversions shall be measured in a manner acceptable to the division engineer. The <br />Applicant shall install and have approved by the Water Commissioner all structures prior to <br />any credit or use in this SWSP. Applicant shall maintain such measuring devices as required <br />by the division engineer for operation of this SWSP. In addition, the applicant shall maintain <br />daily records of all diversions, replacements, and the amount of water used for each <br />particular purpose. The applicant shall provide a report of these records to the division <br />engineer and the water commissioner on a monthly basis, or more frequent as required, on a <br />form approved by them. The accounting must be submitted to the division engineer in <br />Greeley(DNR_DivlAccounting@state.co.us) and the water commissioners [Jorge Vidal <br />(Jorge,VidalCstate.co. us), Mark Simpson (Mark. Simpson@state.co. us), Shera Sumerford <br />(She ra.SumerfordCstate.co. us), and Bob Carlson (Bob. Carlson2state.co.us)] within 30 <br />calendar days of the end of the month for which the accounting is being made. Submitted <br />accounting shall conform to the Administration Protocol "Augmentation Plan Accounting, <br />Division One - South Platte River" (attached). <br />In addition, the applicant shall verify that each entity making replacements for this plan, <br />have included this plan in their respective accounting submitted to the division engineer. For <br />this plan period those entities are the Centennial Water and Sanitation District, City of <br />Westminster, and City of Thornton. <br />12. The installation of any device used for measuring replacement water in this plan must be <br />inspected by a Division 1 hydrographer. Furthermore, the exact location of all return <br />structures utilized in this plan must be provided to the division engineer and appropriate <br />water commissioner in order to allow for inspections of the structures. Finally, all charts or <br />other output data associated with each measuring device utilized in this plan must be <br />provided in a timely manner acceptable to all of the water commissioners identified herein. <br />13. The Applicant shall be required to notify and obtain approval of the Water Commissioners in <br />writing a minimum of 48 hours, or as required by each individual Water Commissioner, of all <br />Office of the State Engineer <br />1313 Sherman Street, Room 821, Denver, CO 80203 P 303.866.3581 <br />www.water.statexo.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.