My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-06_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2017-03-06_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2017 7:12:32 AM
Creation date
3/6/2017 10:07:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
3/6/2017
Doc Name
Cost Estimate
From
DRMS
To
Jerry Nettleton
Type & Sequence
RN4
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 77 of 89 <br />TRUCK/LOADER TEAM WORK <br />Task description: Clean Sediment Ponds 010, 011, 011A, 012,012A and 014 One T <br />Site: Yoast Mine Permit Action: RN4 Permit/Job#: C1994082 <br />PROJECT IDENTIFICATION <br />Task #: 081 <br />Date: 3/3/2017 <br />2:13:12 PM <br />State: Colorado <br />County: Routt <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: Generic 8-10 cy, 6x4 <br />-Loader: Cat 336D L 10'-6" Stick <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C82-081 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team SuDDort Eauipment Maintenance Eauipment <br />Total work team cost/hour: $375.15 <br />MATERIAL OUANTITIES <br />Initial volume: 20,000 CCY Swell factor: 1.000 <br />Loose volume: 20,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />Truck <br />Excavator Load Area <br />Dump Area Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 NA <br />NA NA <br />NA <br />Ownership cost/hour: <br />$27.37 <br />$46.82 NA <br />NA NA <br />NA <br />Operating cost/hour: <br />$32.23 <br />$52.14 NA <br />NA NA <br />NA <br />%Utilization -riper: <br />NA <br />0 NA <br />NA NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />$0.00 NA <br />NA NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 NA <br />NA NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$37.79 NA <br />NA NA <br />NA <br />Unit Subtotals: <br />$59.60 <br />$136.75 NA <br />NA NA <br />NA <br />Number of Units: <br />4 <br />1 0 <br />0 0 <br />0 <br />Group Subtotals: <br />Work: $375.15 Support: $0.00 Maint: $0.00 <br />Total work team cost/hour: $375.15 <br />MATERIAL OUANTITIES <br />Initial volume: 20,000 CCY Swell factor: 1.000 <br />Loose volume: 20,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.