Laserfiche WebLink
Page 51 of 89 <br />BOREHOLE SEALING WORK <br />Task description: Seal All Monitoring Wells and Exploration Holes <br />Site: Yoast Mine Permit Action: RN4 Permit/Job#: C1994082 <br />PROJECT IDENTIFICATION <br />Task 060 State: Colorado <br />Date: 3/3/2017 County: Routt <br />2:01:52 PM <br />User: JDM <br />Agency or organization name: DRMS <br />UNIT COSTS <br />Abbreviation: None <br />Filename: C084-060 <br />Borehole <br />Sealing/Item <br />Description <br />Method <br />Diameter <br />Length <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Cost <br />Seal All 2" <br />PVC plug - 2 in. <br />2" <br />860 LF <br />16.00 <br />EA <br />$21.67 <br />$346.72 <br />Wells (16) - <br />diameter borehole <br />Plug <br />- Fill Holes <br />Portland cement <br />2" <br />860 LF <br />7.00 <br />bag <br />$10.55 <br />$73.85 <br />with Cement <br />grout ( Bag, material <br />cost onl ...94 lb. ba <br />- Cut Casing <br />Exposed casing <br />2" <br />NA <br />16.00 <br />LF <br />$1.77 <br />$28.32 <br />at Surface <br />removal - Calculate <br />Circumference in <br />Linear Feet <br />- Borehole <br />Borehole <br />NA <br />NA <br />16.00 <br />EA <br />$3.67 <br />$58.72 <br />Marker <br />location/identification <br />marker (EA, material <br />cost only) <br />- Drill Rig <br />Truck Mounted - 3.0 <br />NA <br />NA <br />32.00 <br />EA <br />$157.91 <br />$5,053.12 <br />Time <br />in. - 1,700 ft. capy. <br />- Water <br />Water Tanker, 5,000 <br />NA <br />NA <br />32.00 <br />EA <br />$106.00 <br />$3,392.00 <br />Truck Time <br />Gal. <br />Seal All <br />PVC plug - 4 in. <br />4" <br />5,260 <br />43.00 <br />EA <br />$29.95 <br />$1,287.85 <br />4"Wells (43) <br />diameter borehole <br />LF <br />- Plug <br />- Fill Holes <br />Portland cement <br />4" <br />5,260 <br />159.00 <br />bag <br />$10.55 <br />$1,677.45 <br />with Cement <br />grout ( Bag, material <br />LF <br />cost only ... 94 lb. bag) <br />- Cut Casing <br />Exposed casing <br />4" <br />NA <br />43.00 <br />LF <br />$1.77 <br />$76.11 <br />at Surface <br />removal - Calculate <br />Circumference in <br />Linear Feet <br />- Borehole <br />Borehole <br />NA <br />NA <br />43.00 <br />EA <br />$3.67 <br />$157.81 <br />Marker <br />location/identification <br />marker (EA, material <br />cost only) <br />- Drill Rig <br />Truck Mounted - 3.0 <br />NA <br />NA <br />172.00 <br />EA <br />S157.91 <br />$27,160.52 <br />Time <br />in. - 1,700 ft. capy. <br />- Water <br />Water Tanker, 5,000 <br />NA <br />NA <br />172.00 <br />EA <br />S106.00 <br />$18,232.00 <br />Truck Time <br />Gal. <br />Job Hours: 204.00 Total Cost: $57,544.00 <br />CIRCES Cost Estimating Software <br />