My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-06_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2017-03-06_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2017 7:12:32 AM
Creation date
3/6/2017 10:07:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
3/6/2017
Doc Name
Cost Estimate
From
DRMS
To
Jerry Nettleton
Type & Sequence
RN4
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Yoast Mine <br />PROJECT IDENTIFICATION <br />BULLDOZER WORK <br />Pond 12A <br />Permit Action: RN4 <br />Task #: 037 State: Colorado <br />Date: 3/3/2017 County: Routt <br />1:49:29 PM <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Page 35 of 89 <br />Permit/Job#: C1994082 <br />Abbreviation: None <br />Filename: C082-037 <br />$100.59 <br />Utilization % <br />NA <br />$87.23 <br />100 <br />$10.94 <br />NA <br />$1.71 <br />25 <br />$41.85 <br />NA <br />Total unit Cost/Hour: $242.31 <br />Total Fleet Cost/Hour: 5242.31 <br />MATERIAL QUANTITIES <br />Initial Volume: 9,920 <br />Swell factor: 1.165 <br />Loose volume: 11,557 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 175 feet <br />Unadjusted hourly 805.3 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push 5% <br />gradient: <br />Average site altitude: 7,400 feet <br />Material weight: 2,900 lbs/LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.