Laserfiche WebLink
Loader Worksheet Cont'd Task # 035 Page 32 of 89 <br />Riprap (CY): $103,472.02 <br />Excavation (CY): $4,318.40 <br />Hours <br />Geotextile (SY): <br />87.5 SY/HR <br />Riprap (CY): <br />7.75 CY/HR <br />Excavation (CY): 33.75 <br />CY/HR <br />164.62 <br />309.77 <br />34.49 <br />Total Post -Mining Channel Reconstruction hours: 508.88 Hours <br />Total Post -Mining Channel Reconstruction Cost: $140,200 <br />