My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-06_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2017-03-06_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2017 7:12:32 AM
Creation date
3/6/2017 10:07:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
3/6/2017
Doc Name
Cost Estimate
From
DRMS
To
Jerry Nettleton
Type & Sequence
RN4
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Yoast Mine <br />MOTOR GRADER WORK <br />Regrade Diversion 14A <br />Permit Action: RN4 Permit/Job#: C1994082 <br />PROJECT IDENTIFICATION <br />Task #: 034 <br />Date: 3/3/2017 <br />1:46:03 PM <br />State: Colorado <br />County: Routt <br />Abbreviation: None <br />Filename: C82-034 <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14M Horsepower: 259 <br />Ripper Attachment: Multi -Shank Ripper Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />mph <br />Production Deration - 1.25 <br />0 <br />degrees <br />Utilization % <br />Ownership Cost/flour: <br />$54.68 <br />NA <br />Operating Cost/Hour: <br />$46.99 <br />100 <br />Ripper Ownership Cost/Hour: <br />$3.74 <br />NA <br />Ripper Operating Cost/Hour: <br />$0.79 <br />25 <br />Operator Cost/Hour: <br />$28.90 <br />NA <br />Total Unit Cost/Hour: <br />$135.09 <br />Total Fleet Cost/Hour: $135.09 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 1.10 <br />Source of estimated acreage <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />Selected Application: <br />Selected Blade Angle: <br />Effective Blade Length: <br />Width of blade overlap per pass: <br />Net grading or ripping width per pass: <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />Division Estimate <br />1.25 <br />mph <br />Production Deration - 1.25 <br />0 <br />degrees <br />14.00 <br />feet <br />2.00 <br />feet <br />12.00 <br />feet <br />1.8182 <br />acres/hour <br />Site Altitude: 7200 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.90 (1sh/d, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: 1.6364 acres/Hour <br />Adjusted Hourly Fleet Production: 1.6364 acres/Hour <br />JOB TIME AND COST <br />acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.