My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-06_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2017-03-06_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2017 7:12:32 AM
Creation date
3/6/2017 10:07:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
3/6/2017
Doc Name
Cost Estimate
From
DRMS
To
Jerry Nettleton
Type & Sequence
RN4
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
071 <br />Shrub/Tree Planting - List 1 - Replant Areas <br />REVEGE <br />1 <br />41.60 <br />$100,321.00 <br />Total = <br />Released <br />Job superintendent: <br />1,498.12 <br />Total = <br />$109,437.67 <br />072 <br />1 <br />$1,749.00 <br />Drill Seed Cover Crop <br />REVEGE <br />242.90 <br />073 <br />1 <br />$15,034.00 <br />Drill Seed Mix 1B on Haul Road and Deadhead <br />REVEGE <br />40.00 <br />Corridor <br />074 <br />1 <br />$145,176.00 <br />Drill Seed Mix 1 - Reseed Phase II Areas -100% of <br />REVEGE <br />592.70 <br />592.7 Acre <br />080 <br />1 <br />$112,939.00 <br />Rill and Gully and Road Maintenance <br />SITEMAINT <br />220.00 <br />ENANCE <br />081 <br />1 <br />$54,724.00 <br />Clean Sediment Ponds 010, 011, 011A, 012, 012A <br />TRUCKI <br />145.87 <br />and 014 One T <br />085 <br />1 <br />$10,142.00 <br />Mobilize/Demobilize Equipment for Initial <br />MOBILIZE <br />3.33 <br />Reclamation <br />086 <br />1 <br />$2,652.00 <br />Mobilize/Demobilize Equipment for Pond <br />MOBILIZE <br />3.33 <br />Removal <br />087 <br />1 <br />$53,921.00 <br />Mobilize/Demobilize Equipment for Site <br />MOBILIZE <br />11.33 <br />Maintenance <br />100 <br />1 <br />$2,253.00 <br />Re rade Pond 013 Slide Scarp <br />DOZER <br />9.81 <br />101 <br />1 <br />$1,126.00 <br />Re rade Neck Pit Slide Scarp <br />DOZER <br />4.90 <br />SUBTOTALS: <br />2962.23 <br />$1,457,502 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02 <br />Total = <br />$29,441.54 <br />Performance bond: <br />1.05 <br />Total = <br />$15,303.77 <br />Job superintendent: <br />1,498.12 <br />Total = <br />$109,437.67 <br />Profit: <br />10.00 <br />Total = <br />$145,750.20 <br />TOTAL O & P = <br />$299,933.18 <br />CONTRACT AMOUNT (direct + O & P) = <br />$1,757,435.18 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contractibid preparation: <br />Reclamation management and/or administration: <br />0.00 <br />4.25 <br />4.00 <br />CONTINGENCY: 0.00 <br />Total = <br />Total = <br />0.00 <br />$74,691.00 <br />$70,297.41 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $444,921.58 <br />TOTAL BOND AMOUNT (direct + indirect) = $1,902,423.58 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.