My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-06_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2017-03-06_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2017 7:12:32 AM
Creation date
3/6/2017 10:07:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
3/6/2017
Doc Name
Cost Estimate
From
DRMS
To
Jerry Nettleton
Type & Sequence
RN4
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip Final Regraded Areas <br />Site: Yoast Mine Permit Action: RN4 <br />PROJECT IDENTIFICATION <br />Task #: 014 State: Colorado <br />Date: 3/3/2017 County: Routt <br />1:38:15 PM <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: OBSOLETE - Cat D11R - <br />11 SU <br />Ripper Attachment: 3 -Shank Ripper <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Ownership Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />MATERIAL QUANTITIES <br />Alternate Methods: <br />Permit/Job#: C1994082 <br />Abbreviation: None <br />Filename: C82-014 <br />Horsepower: <br />850 <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />$220.12 <br />Utilization % <br />NA <br />$235.69 <br />100 <br />$19.19 <br />NA <br />$10.23 <br />100 <br />$41.85 <br />NA <br />$527.08 <br />$527.08 <br />Selected estimating method: Area <br />Seismic: NA Bank Volume: NA <br />Area: 20.00 acres Rip Depth (ft): 1.50 <br />Source of estimated quantity: Division Estimate <br />HOURLY PRODUCTION <br />Seismic: <br />BCY NA <br />Volume: 48,400 BCY or CCY <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />3.51 <br />mph <br />Average Ripping Width: <br />9.83 <br />degrees <br />Average Ripping Length: <br />400.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />1.129 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />1.129 <br />Acres/hr <br />Site Altitude: <br />7,500 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.94 <br />Acres/hr <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.