Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT <br />Page 4 of 7 <br />Fuel Island <br />gal. tank <br />1000 Gallons Oil <br />1000 Gallons <br />Comprehensive storage <br />1.00 <br />EA <br />$3,409.60 <br />$3,409.60 <br />Tank; #5a Mine <br />tank removal, non - <br />Portal MSB Fuel <br />leaking - 3,000 to 5,000 <br />Island <br />gal. tank <br />500 Gallon Antifreeze <br />500 Gallons <br />Comprehensive storage <br />1.00 <br />EA <br />$3,409.60 <br />$3,409.60 <br />Tank; #5a Mine <br />tank removal, non - <br />Portal MSB Fuel <br />leaking - 3,000 to 5,000 <br />Island <br />gal. tank <br />Rock Dust Tank; <br />8'D x 20' <br />Bldg. (MN) demo./on- <br />1,005.00 <br />CF <br />$0.22 <br />$221.10 <br />Empire Village <br />site disposal in <br />excavated pit - Max. 200 <br />ft. push <br />2 Rock Dust Tanks; <br />8'D x 20'(2) <br />Bldg. (MN) demo./on- <br />2,010.00 <br />CF <br />$0.22 <br />$442.20 <br />Shop area <br />site disposal in <br />excavated pit - Max. 200 <br />ft. push <br />Rock Dust Tank; #5A <br />8'D x 20' <br />Bldg. (MN) demo./on- <br />1,005.00 <br />CF <br />$0.22 <br />$221.10 <br />Portal Area <br />site disposal in <br />excavated pit - Max. 200 <br />ft. push <br />Bathouses Near Mine <br />24'x 50' x12 <br />Bldg. (SN) demo./on- <br />43,200.00 <br />CF <br />$0.19 <br />$8,380.80 <br />Office (Men's, <br />(3) <br />site disposal in <br />Womens and Visitor <br />excavated pit - Max. 200 <br />ft. push <br />No. 5 Mine Conveyor <br />380 LF (?) <br />Conveyor, elevated, <br />380.00 <br />LF <br />$44.51 <br />$16,913.42 <br />including supports - 5 ft. <br />W x 6 ft. H housing <br />No. 5A Conveyor and <br />120 LF <br />Conveyor, overland, <br />120.00 <br />LF <br />$17.60 <br />$2,112.00 <br />Transfer (Mine <br />including supports - 5 ft. <br />Overland) <br />W x 6 ft. H housing <br />48 -Inch Overland <br />1712 LF <br />Conveyor, elevated, <br />1,712.00 <br />LF <br />$53.42 <br />$91,455.04 <br />Conveyor (MIne <br />including supports - 8 ft. <br />Overland) <br />W x 10 ft. H housing <br />Stacking Tube <br />85'x 12'D <br />Bldg. (MN) demo./on- <br />9,613.00 <br />CF <br />$0.22 <br />$2,114.86 <br />site disposal in <br />excavated pit - Max. 200 <br />ft. push <br />Reclaim Tunnel <br />4 @ 270' <br />Demo. and on-site <br />14,040.00 <br />SF <br />$1.30 <br />$18,294.12 <br />xl3'xl2" <br />disposal in excavated <br />pit, 12 in. thick - Max. <br />200 ft. push <br />Reclaim Tunnel <br />300 LF <br />Conveyor, overland, <br />300.00 <br />LF <br />$17.60 <br />$5,280.00 <br />Conveyor <br />including supports - 5 ft. <br />W x 6 ft. H housing <br />Screening and Sizing <br />70'x 60'x 40' <br />Bldg. (MN) demo./on- <br />168,000.00 <br />CF <br />$0.22 <br />$36,960.00 <br />Building <br />site disposal in <br />excavated pit - Max. 200 <br />ft. push <br />-Footers <br />1'x2'x252 LF <br />Demo. and on-site <br />252.00 <br />LF <br />$2.61 <br />$657.72 <br />disposal in excavated <br />pit, 1.0 ft. x 2 ft. - Max. <br />200 ft. push <br />-Pad <br />70'x60'x6" <br />Demo. and on-site <br />4,200.00 <br />SF <br />$0.65 <br />$2,738.40 <br />disposal in excavated <br />pit, 6 in. thick - Max. <br />200 ft. push <br />36 -inch Overland <br />900 LF <br />Conveyor, overland, <br />900.00 <br />LF <br />$17.60 <br />$15,840.00 <br />Conveyor to Sample <br />including supports - 5 ft. <br />CIRCES Cost Estimating Software <br />