My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-03_REVISION - C1981044
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2017-03-03_REVISION - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 9:23:49 AM
Creation date
3/6/2017 7:48:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Revision
Doc Date
3/3/2017
Doc Name
Cost Estimate
From
DRMS
To
Jerry Nettleton
Type & Sequence
SI2
Email Name
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT <br />Page 2 of 7 <br />CIRCES Cost Estimating Software <br />ft. push <br />-Footers <br />1'x2'x346 LF <br />Demo. and on-site <br />346.00 <br />LF <br />$2.61 <br />$903.06 <br />disposal in excavated <br />pit, 1.0 ft. x 2 ft. - Max. <br />200 ft. push <br />-Pad <br />125'X50'x6" <br />Demo. and on-site <br />6,250.00 <br />SF <br />$0.65 <br />$4,075.00 <br />disposal in excavated <br />pit, 6 in. thick - Max. <br />200 ft. push <br />100,000 Gallon Water <br />13370 CF <br />Bldg. (MN) demo./on- <br />13,370.00 <br />CF <br />$0.22 <br />$2,941.40 <br />Tank near MSB <br />site disposal in <br />excavated pit - Max. 200 <br />ft. push <br />-Footers <br />1'x2'x94 LF <br />Demo. and on-site <br />94.00 <br />LF <br />$2.61 <br />$245.34 <br />disposal in excavated <br />pit, 1.0 ft. x 2 ft. - Max. <br />200 ft. push <br />Carpenter Shop <br />50'x20'xlO' <br />Bldg. (MN) demo./on- <br />10,000.00 <br />CF <br />$0.22 <br />$2,200.00 <br />site disposal in <br />excavated pit - Max. 200 <br />ft. push <br />-Footers <br />1'x2'x132 LF <br />Demo. and on-site <br />132.00 <br />LF <br />$2.61 <br />$344.52 <br />disposal in excavated <br />pit, 1.0 ft. x 2 ft. - Max. <br />200 ft. push <br />Brazell -Simms <br />60'x40'xl5' <br />Bldg. (MN) demo./on- <br />36,000.00 <br />CF <br />$0.22 <br />$7,920.00 <br />Building <br />site disposal in <br />excavated pit - Max. 200 <br />ft. push <br />-Footers <br />1'x2'x192 LF <br />Demo. and on-site <br />192.00 <br />LF <br />$2.61 <br />$501.12 <br />disposal in excavated <br />pit, 1.0 ft. x 2 ft. - Max. <br />200 ft. push <br />-Pad <br />60'x40'x4" <br />Demo. and on-site <br />2,400.00 <br />SF <br />$0.43 <br />$1,041.60 <br />disposal in excavated <br />pit, 4 in. thick - Max. <br />200 ft. push <br />No. 9 Portal <br />24'x50'xl2' <br />Bldg. (MN) demo./on- <br />43,200.00 <br />CF <br />$0.22 <br />$9,504.00 <br />Warehouse/Bathhouse <br />site disposal in <br />excavated pit - Max. 200 <br />ft. push <br />-Footers <br />1'x2'x420 LF <br />Demo. and on-site <br />420.00 <br />LF <br />$2.61 <br />$1,096.20 <br />disposal in excavated <br />pit, 1.0 ft. x 2 ft. - Max. <br />200 ft. push <br />Reclamatin <br />70'x100'xl5' <br />Bldg. (MN) demo./on- <br />105,000.00 <br />CF <br />$0.22 <br />$23,100.00 <br />Building(Pole Barn) <br />site disposal in <br />excavated pit - Max. 200 <br />ft. push <br />-Footers <br />1'x2'x334 LF <br />Demo. and on-site <br />334.00 <br />LF <br />$2.61 <br />$871.74 <br />disposal in excavated <br />pit, 1.0 ft. x 2 ft. - Max. <br />200 ft. push <br />-Pad <br />1'x2'x4" <br />Demo. and on-site <br />7,000.00 <br />SF <br />$0.43 <br />$3,038.00 <br />disposal in excavated <br />pit, 4 in. thick - Max. <br />200 ft. push <br />500 Gallon Antifreeze <br />500 Gallons <br />Comprehensive storage <br />1.00 <br />EA <br />$3,409.60 <br />$3,409.60 <br />Tank; #5 Fuel Island <br />tank removal, non- <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.