Laserfiche WebLink
Task description: <br />Site: Williams Fork Mines <br />BULLDOZER RIPPING WORK <br />Portal No. 5A Lower Bench <br />Permit Action: MT7 <br />PROJECT IDENTIFICATION <br />Task #: 023 State: Colorado <br />Date: 3/2/2017 County: Moffat <br />1:26:06 PM <br />User: TNL <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D l OT - 10SU <br />Ripper Attachment: 1 -Shank Ripper <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Ownership Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Permit/Job#: C1981044 <br />Abbreviation: None <br />Filename: C1981044-023 <br />Horsepower: 574 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />$122.17 <br />Utilization % <br />NA <br />$111.29 <br />100 <br />$15.98 <br />NA <br />$8.78 <br />100 <br />$41.85 <br />NA <br />Total Unit Cost/Hour: $300.07 <br />Total Fleet Cost/Hour: $1,200.26 <br />MATERIAL QUANTITIES Selected estimating method: <br />Alternate Methods: <br />Area <br />Seismic: NA Bank Volume: <br />NA <br />BCY NA <br />Area: 4.65 acres Rip Depth (ft): <br />1.50 <br />Volume: 11,253 BCY or CCY <br />Source of estimated quantity: Page 2.05.4-22R <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />4.49 <br />mph <br />Average Ripping Width: <br />6.74 <br />degrees <br />Average Ripping Length: <br />200.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.736 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.736 <br />Acres/hr <br />Site Altitude: <br />5,400 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.61 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />2.44 <br />Acres/hr <br />JOB TIME AND COST <br />Fleet size: 4 Grader(s) <br />Total job time: <br />1.90 Hours <br />Unit cost: $491.204 Per acre <br />Total job cost: <br />$2,284 <br />CIRCES Cost Estimating Software <br />