Laserfiche WebLink
Scraper Worksheet Cont'd <br />Task description: <br />Site: Williams Fork Mines <br />Task # 020 <br />SCRAPER TEAM WORK <br />Haul Subsoil from Berm to Refuse Pile <br />PROJECT IDENTIFICATION <br />Permit Action: MT7 <br />Task #: 020 State: Colorado <br />Date: 3/2/2017 County: Moffat <br />11:40:40 AM <br />User: TNL <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 637G <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Page 1 of 2 <br />Permit/Job#: C1981044 <br />Abbreviation: None <br />Filename: C1981044-020 <br />COSTShift basis: 1 ner day <br />Cost Breakdown: Scraper Work Team Sunnort Fouinment Maintenance F,auinment <br />Total work team cost/hour: $684.98 <br />MATERIAL QUANTITIES <br />Initial volume: 35,212 CCY Swell factor: 1.125 <br />Loose volume: 39,614 LCY <br />Source of estimated volume: Page 2.05.5-18Ra <br />Source of estimated swell factor: Cat Handbook <br />1[1111.7 ald 9:211110 Y [I]1I <br />Material weight: 2,650 lbs/LCY <br />Material description: Decomposed rock - 25% Rock, <br />75% Earth <br />Rated Payload: 81,600 pounds <br />Scraper Bowl (volume) Basis: <br />Struck Volume: 24.00 LCY <br />Heaped Volume: 34.00 LCY <br />Average Volume: 29.00 LCY <br />CIRCES Cost Estimating Software <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$152.84 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$158.39 <br />NA <br />NA <br />NA <br />NA <br />NA <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$31.26 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$342.49 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$684.98 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $684.98 <br />MATERIAL QUANTITIES <br />Initial volume: 35,212 CCY Swell factor: 1.125 <br />Loose volume: 39,614 LCY <br />Source of estimated volume: Page 2.05.5-18Ra <br />Source of estimated swell factor: Cat Handbook <br />1[1111.7 ald 9:211110 Y [I]1I <br />Material weight: 2,650 lbs/LCY <br />Material description: Decomposed rock - 25% Rock, <br />75% Earth <br />Rated Payload: 81,600 pounds <br />Scraper Bowl (volume) Basis: <br />Struck Volume: 24.00 LCY <br />Heaped Volume: 34.00 LCY <br />Average Volume: 29.00 LCY <br />CIRCES Cost Estimating Software <br />