My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-03_REVISION - C1981044
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2017-03-03_REVISION - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 9:23:49 AM
Creation date
3/6/2017 7:48:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Revision
Doc Date
3/3/2017
Doc Name
Cost Estimate
From
DRMS
To
Jerry Nettleton
Type & Sequence
SI2
Email Name
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: Cost <br />Site: Williams Fork Mines <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Permit Action: MT7 <br />Task #: 000 State: Colorado <br />Date: 3/2/2017 County: Moffat <br />3:14:30 PM <br />User: TNL <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C1981044 <br />Abbreviation: None <br />Filename: C044-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />007 <br />008 <br />009 <br />011 <br />012 <br />014 <br />015 <br />016 <br />018 <br />019 <br />020 <br />021 <br />022 <br />023 <br />024 <br />025 <br />026 <br />027 <br />028 <br />029 <br />031 <br />032 <br />033 <br />034 <br />035 <br />037 <br />038 <br />040 <br />041 <br />042 <br />Structure Demolition <br />DEMOLISH <br />1 <br />1 <br />1 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />1 <br />4 <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2,977.82 <br />$788,655.89 <br />$89,784.03 <br />$69,330.00 <br />$71,312.00 <br />$325,643.00 <br />$7,593.00 <br />$1,358.00 <br />$8,906.00 <br />$2,207.00 <br />$45.00 <br />$683.00 <br />$484,483.00 <br />$22,400.00 <br />$29,780.00 <br />$1,330.00 <br />$1,803.00 <br />$2,284.00 <br />$1,918.00 <br />$1,781.00 <br />$2,280.00 <br />$2,323.00 <br />$1,334.00 <br />$774.00 <br />$1,690.00 <br />$4,986.00 <br />$2,124.00 <br />$78.00 <br />$629.00 <br />$79.00 <br />$233.00 <br />$27.00 <br />$128.00 <br />$891.00 <br />Plug and Seal All Wells <br />BOREHOLE <br />248.00 <br />Seal and Backfill All Mine and Vent Shaft Entries <br />MINESEAL <br />200.00 <br />Regrade Portal No. 5 Facilities Area <br />DOZER <br />60.93 <br />Regrade Portal No. 5A Facilities Area <br />DOZER <br />278.23 <br />Push Gravel and Rock to Box Cut at Portal No. 5A <br />DOZER <br />6.52 <br />Regrade Overland Conveyor Corridor <br />DOZER <br />1.17 <br />Regrade Old Shop Area at Empire Village <br />DOZER <br />7.64 <br />Regrade Mine No. 9 Refuse Pile <br />DOZER <br />1.89 <br />Remove Fill from No. 5 Mine Dewatering <br />Borehole Access Road <br />DOZER <br />0.04 <br />Regrade Access Road <br />DOZER <br />0.59 <br />Cover Mine No. 9 Portal Refuse and Facilities <br />Area with Berm <br />DOZER <br />415.82 <br />Replace Topsoil from Stockpile to Refuse Pile <br />SCRAPERI <br />32.70 <br />Haul Subsoil from Berm to Refuse Pile <br />SCRAPERI <br />43.48 <br />Push Waste Rock at Portal No. 5A to Highwall <br />DOZER <br />1.14 <br />Rip Rock Crusher Area <br />RIPPER <br />1.50 <br />Rip Portal No. 5A Lower Bench <br />RIPPER <br />1.90 <br />Remove Access Road and Haul Material to Refuse <br />Pile <br />SCRAPERI <br />2.80 <br />Finish Grade Portal No. 5 Area <br />GRADER <br />13.26 <br />Finish Grade Portal No. 5A Area <br />GRADER <br />16.97 <br />Finish Grade Refuse Area <br />GRADER <br />17.29 <br />Finish Grade Portal No. 9 Refuse and Facilities <br />Area <br />GRADER <br />9.93 <br />Finish Grade Old Shop Area <br />GRADER <br />5.76 <br />Regrade Ponds 5-P5, 5-P6, 5-P7 and Rams <br />SCRAPERI <br />2.47 <br />Regrade Sewage Treatment Ponds 5-P1, 5-P2 and <br />5-P3 <br />DOZER <br />4.28 <br />Regrade Pond 5A -P1 <br />DOZER <br />8.77 <br />Regrade Pond SHP2 <br />DOZER <br />0.32 <br />Regrade Pond SHP1 <br />DOZER <br />2.60 <br />Regrade Pond 9-P3 <br />DOZER <br />0.33 <br />Regrade Pond 9-P1 <br />DOZER <br />0.96 <br />Regrade Pond 9-P4 <br />DOZER <br />0.11 <br />Regrade Pond 9-P5 <br />DOZER <br />0.53 <br />Regrade Pond 9-P6 <br />DOZER <br />3.68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.