My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-03_REVISION - C1981044
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2017-03-03_REVISION - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 9:23:49 AM
Creation date
3/6/2017 7:48:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Revision
Doc Date
3/3/2017
Doc Name
Cost Estimate
From
DRMS
To
Jerry Nettleton
Type & Sequence
SI2
Email Name
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd <br />Visibility: <br />LOOa <br />Job efficiency: <br />0.83a <br />Spoil pile: <br />0.80a <br />Push gradient: <br />0.903 <br />Altitude: <br />LOOa <br />Material Weight: <br />0.868 <br />Blade type: <br />1.00o <br />Net correction: 0.3513 <br />Adjusted unit production: 238.88 LCY/hr <br />Adjusted fleet production: 955.52 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $1.225/LCY <br />Total job time: 60.93 Hours <br />Total job cost: $71,312 <br />Task # 007 <br />(AVG.) <br />(1 SHIFT/DAY) <br />(FND-RF) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.