Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Remaining Tasks MT5 <br />Site: Hayden Gulch Loadout Permit Action: MT5 <br />PROJECT IDENTIFICATION <br />Task #: A01 State: Colorado <br />Date: 3/3/2017 County: Routt <br />9:06:05 AM <br />User: JDM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C1992081 <br />Abbreviation: None <br />Filename: C081 -A01 <br />Task <br />Form <br />Description Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />006 <br />007 <br />011 <br />015 <br />018 <br />019 <br />020 <br />021 <br />024 <br />025 <br />028 <br />031 <br />032 <br />033 <br />034 <br />037 <br />040 <br />041 <br />045 <br />046 <br />047 <br />501 <br />502 <br />503 <br />504 <br />505 <br />506 <br />Regrade Rail Loop DOZER <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />1 <br />2 <br />2 <br />2 <br />79.85 <br />$47,582.00 <br />$31,827.00 <br />$1,720.00 <br />$607.00 <br />$792.00 <br />$1,888.00 <br />$7,606.00 <br />$487.00 <br />$1,650.00 <br />$4,874.00 <br />$1,950.00 <br />$84,068.00 <br />$17,035.00 <br />$142.71 <br />$28,894.00 <br />$746.00 <br />$22,424.00 <br />$3,272.00 <br />$206,836.93 <br />$3,464.00 <br />$10,795.20 <br />$9,492.00 <br />$3,578.00 <br />$5,710.00 <br />$33,248.00 <br />$164,073.00 <br />$9,157.00 <br />$52,865.00 <br />$43,554.00 <br />$15,125.00 <br />Regrade Rail Spur DOZER <br />54.93 <br />Regrade Facilities Area; Office/Parking Lot DOZER <br />5.94 <br />Rip Facilities Area RIPPER <br />2.03 <br />Rip Haul Road HGLF-HRI RIPPER <br />2.65 <br />Regrade Haul Road HGLF-HR1 DOZER <br />6.34 <br />Finish Grade Disturbed Area GRADER <br />56.63 <br />Regrade Truck Loop Pond DOZER <br />1.68 <br />Regrade Rail Loop Pond DOZER <br />5.70 <br />Regrade All Ditches DOZER <br />8.41 <br />Regrade Leach Field DOZER <br />6.73 <br />Replace Topsoil on Rail Loop and Facilities Area SCRAPERI <br />122.73 <br />Replace Topsoil on Rail Spur SCRAPER1 <br />24.87 <br />Seal Alluvial Wells HGDAL3 and 4 BOREHOLE <br />0.00 <br />Drill Seed Mix 41 REVEGE <br />57.20 <br />Drill Seed Mix 42 REVEGE <br />2.40 <br />Drill Seed Mix 43 REVEGE <br />42.90 <br />Hydroseed Mix #3 REVEGE <br />2.00 <br />Demolish and Remove Structures DEMOLISH <br />0.00 <br />Clean Sediment from Ponds Once During Liability TRUCKI <br />Period <br />7.01 <br />Site Maintenance Over the Ten -Year Liability SITEMAINT <br />Period ENANCE <br />80.00 <br />Mob/Demob equip. for Reclamation of Loadout MOBILIZE <br />Area and TAHR <br />3.60 <br />Mob/Demobilization for Pond Removal MOBILIZE <br />3.60 <br />Mob/Demobilization for Maintanence and Pond MOBILIZE <br />Cleaning <br />3.60 <br />Rip TAHR RIPPER <br />55.40 <br />Remove TAHR Surface Material to Pit SCRAPERI <br />104.56 <br />Grade TAHR to Blend GRADER <br />66.61 <br />Replace Topsoil from Stockpile A to TAHR SCRAPERI <br />Stations 114 to 216 <br />33.69 <br />Replace Topsoil from Stockpile C to TAHR SCRAPERI <br />Stations 92 to 144 <br />27.76 <br />Replace Topsoil from Stockpile D to TAHR SCRAPERI <br />Stations 76 to 92 <br />9.64 <br />