Laserfiche WebLink
Page 57 of 74 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile A to TAHR Stations 114 to 216 <br />Site: Hayden Gulch Loadout Permit Action: MT5 Permit/Job#: C1992081 <br />PROJECT IDENTIFICATION <br />Task #: 504 State: Colorado Abbreviation: None <br />Date: 3/3/2017 County: Routt Filename: C81--504 <br />8:57:51 AM <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 637G <br />-Dozer: NA <br />COSTShift basis: 1 per day <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 10,000 Gal. <br />Cost Breakdown: Scraner Work Team Sunnort Fouinment Maintenance F,auinment <br />Total work team cost/hour: $1,569.19 <br />MATERIAL OUANTITIES <br />Initial volume: 47,700 CCY Swell factor: <br />Loose volume: 47,700 LCY <br />Source of estimated volume: Seneca II -W Permit Table 21-3 <br />Source of estimated swell factor: Cat Handbook <br />1[1111.7 ald 9:211110 Y [I]1I <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$152.84 <br />NA <br />NA <br />NA <br />$54.68 <br />$60.47 <br />Operating cost/hour: <br />$158.39 <br />NA <br />NA <br />NA <br />$11.75 <br />$22.04 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$31.26 <br />NA <br />NA <br />NA <br />$28.90 <br />$21.39 <br />Unit Subtotals: <br />$342.49 <br />NA <br />NA <br />NA <br />$95.33 <br />$103.90 <br />Number of Units: <br />4 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,369.96 <br />Support: <br />$0.00 <br />Maint: <br />$199.23 <br />Total work team cost/hour: $1,569.19 <br />MATERIAL OUANTITIES <br />Initial volume: 47,700 CCY Swell factor: <br />Loose volume: 47,700 LCY <br />Source of estimated volume: Seneca II -W Permit Table 21-3 <br />Source of estimated swell factor: Cat Handbook <br />1[1111.7 ald 9:211110 Y [I]1I <br />Material weight: <br />2,100 lbs/LCY <br />Material description: <br />Earth - Loam <br />Rated Payload: <br />81,600 pounds <br />Payload Capacity: <br />38.86 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />