Laserfiche WebLink
EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: Mob/Demobilization for Pond Removal <br />Site: Hayden Gulch Loadout Permit Action: MT5 <br />PROJECT IDENTIFICATION <br />Task #: 046 State: Colorado <br />Date: 3/3/2017 County: Routt <br />8:53:43 AM <br />User: JDM <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Page 47 of 74 <br />Permit/Job#: C1992081 <br />Abbreviation: None <br />Filename: C81-046 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON -HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT <br />TRAILER (25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />0-25 Tons <br />26-50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />93.31 <br />$111.83 <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost/hr/uni <br />Size <br />Cost/hr/ <br />Cost/hr/ fleet <br />Cost/ fleet <br />(TONS) <br />t <br />fleet <br />Cat D10T-10SU <br />93.31 <br />$111.83 <br />$125.45 <br />1 <br />$237.28 <br />$125.45 <br />$500.00 <br />Drill/Broadcast <br />25.00 <br />$39.59 <br />$88.67 <br />1 <br />$128.26 <br />$88.67 <br />$250.00 <br />Seeder with <br />Tractor <br />Power Mulcher <br />6.00 <br />$7.03 <br />$88.67 <br />1 <br />$95.70 <br />$88.67 <br />$250.00 <br />(Reinco M90) <br />Subtotals: 1 $461.24 $302.79 $1,000.00 <br />ROADABLE EQUIPMENT: <br />Machine Description <br />Total Cost/hr/ <br />unit <br />Fleet Size <br />Haul Trip <br />Cost/hr/ fleet <br />Return Trip <br />Cost/hr/ fleet <br />Flatbed Truck, 6x4, 45K GVW <br />$55.51 <br />1 <br />$55.51 <br />$55.51 <br />Subtotals: $55.51 $55.51 <br />CIRCES Cost Estimating Software <br />