Laserfiche WebLink
BULLDOZER WORK <br />Task description: Regrade Truck Loop Pond <br />Site: Hayden Gulch Loadout Permit Action: MT5 <br />PROJECT IDENTIFICATION <br />Task #: 018 State: Colorado <br />Date: 3/3/2017 County: Routt <br />8:38:32 AM <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D10T - IOSU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Page 17 of 74 <br />Permit/Job#: C1992081 <br />Abbreviation: None <br />Filename: C81-018 <br />$122.17 <br />Utilization % <br />NA <br />$111.29 <br />100 <br />$14.40 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />Total unit Cost/Hour: $289.71 <br />Total Fleet Cost/Hour: 5289.71 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,000 <br />Swell factor: 1.125 <br />Loose volume: 1,125 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly 1,718.9 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push 0% <br />gradient: <br />Average site altitude: 6,400 feet <br />Material weight: 2,650 lbs/LCY <br />CIRCES Cost Estimating Software <br />