My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-03_REVISION - C1992081
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2017-03-03_REVISION - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2017 10:41:42 AM
Creation date
3/3/2017 10:34:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
3/3/2017
Doc Name
Midterm Review Document
From
DRMS
To
Jerry Nettleton
Type & Sequence
MT5
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job Condition Correction Factor <br />Operator Skill: <br />0.750 <br />Material consistency: <br />0.900 <br />Dozing method: <br />1.000 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: <br />1.225 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.868 <br />Blade type: <br />1.000 <br />Net correction: 0.4766 <br />Adjusted unit 450.86 LCY/hr <br />production: <br />Adjusted fleet 901.72 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.661/LCY <br />Total job time: 79.85 Hours <br />Total job cost: $47,582 <br />Source <br />(AVG.) <br />(CAT HB)) <br />(GEN.) <br />(AVG.) <br />(1 SHIFT/DAY) <br />(FND-RF) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.