My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-01_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2017-03-01_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2017 6:33:12 AM
Creation date
3/2/2017 12:33:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
3/1/2017
Doc Name
Cost Estimate
From
Jason Musick
To
Clayton Wein
Type & Sequence
RN4
Email Name
JDM
CCW
JRS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 7 of 340 <br />TRUCK/LOADER TEAM WORK <br />Task description: Pull back and Haul Portal Bench Fill Material to Cut Slope <br />Site: Bowie No. 2 Mine Permit Action: RN4 Permit/Job#: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 001 <br />Date: 3/1/2017 <br />7:07:24 AM <br />State: Colorado <br />County: Delta <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: Cat 773F <br />-Loader: Cat 365C L 13'-7" Stick <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C083-001 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team SuDDort Eauinment Maintenance Eauinment <br />Total work team cost/hour: $692.11 <br />MATERIAL QUANTITIES <br />Initial volume: 260,953 CCY Swell factor: 1.165 <br />Loose volume: 304,010 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />Truck <br />Excavator Load Area <br />Dump Area Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 NA <br />NA NA <br />NA <br />Ownership cost/hour: <br />$107.96 <br />$109.56 NA <br />NA NA <br />NA <br />Operating cost/hour: <br />$81.97 <br />$102.56 NA <br />NA NA <br />NA <br />%Utilization -riper: <br />NA <br />0 NA <br />NA NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />$0.00 NA <br />NA NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 NA <br />NA NA <br />NA <br />Operator cost/hour: <br />$31.17 <br />$37.79 NA <br />NA NA <br />NA <br />Unit Subtotals: <br />$221.10 <br />$249.91 NA <br />NA NA <br />NA <br />Number of Units: <br />2 <br />1 0 <br />0 0 <br />0 <br />Group Subtotals: <br />Work: $692.11 Support: $0.00 Maint: $0.00 <br />Total work team cost/hour: $692.11 <br />MATERIAL QUANTITIES <br />Initial volume: 260,953 CCY Swell factor: 1.165 <br />Loose volume: 304,010 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.