Laserfiche WebLink
Page 45 of 340 <br />HYDRAULIC EXCAVATOR WORK <br />Task description: Regrade Upper Parking Lot Expansion Area <br />Site: Bowie No. 2 Mine Permit Action: RN4 Permit/Job#: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 025 <br />Date: 3/1/2017 <br />7:36:06 AM <br />User: JDM <br />State: Colorado <br />County: Delta <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 365C L 13'-7" Stick <br />Attachment 1: ROPS Cab <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $109.56 NA <br />Operating Cost/Hour: $102.56 100 <br />Operator Cost/Hour: $37.79 NA <br />Total Unit Cost/Hour: $249.91 <br />Abbreviation: None <br />Filename: C083-025 <br />Horsepower: <br />Weight (MT): <br />Shift Basis: <br />Data Source: <br />Total Fleet Cost/Hour: $249.91 <br />MATERIAL QUANTITIES <br />Initial volume: 1,500 CCY Swell factor: 1.250 <br />Loose volume: 1,875 LCY <br />Source of estimated volume: Opeator Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket. swine loaded. dump bucket. swine emot <br />Basic Job Condition Description: <br />Secondary Job Condition within Basic Description: <br />Cycle Time Value: <br />Load Bucket Capacity <br />SEVERE <br />SEVERE <br />404 <br />70.51 <br />1 per day <br />(CRG) <br />0.570 minutes <br />Bucket Size Class: Large <br />Rated Capacity: 6.90 LCY (heaped) <br />Bucket Fill Factor: 0.850 Hard, tough clay (80% - 90%) 0.850 <br />Adjusted Capacity: 5.87 LCY <br />Job Condition Correction Factors Site Altitude: 6900 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />617.37 LCY/Hour <br />512.42 LCY/Hour <br />512.42 LCY/Hour <br />CIRCES Cost Estimating Software <br />