Laserfiche WebLink
Page 28 of 340 <br />SCRAPER TEAM WORK <br />Task description: Haul Fill from Upper Mat'l Strge Area to B -Seam Portal Bench <br />Site: Bowie No. 2 Mine Permit Action: RN4 Permit/Job#: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 013 <br />Date: 3/1/2017 <br />7:19:13 AM <br />State: Colorado <br />County: Delta <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 627G <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C083-013 <br />COSTShift basis: 1 ner day <br />Cost Breakdown: Scraner Work Team Sunnort Fouinment Maintenance F,auinment <br />Total work team cost/hour: $498.48 <br />MATERIAL OUANTITIES <br />Initial volume: 39,000 CCY Swell factor: 1.165 <br />Loose volume: 45,435 LCY <br />Source of estimated volume: Operator Estimate, minus 14,000 cy TR79/TR84 to Gob Pile <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraner Bowl (volume) Basis: <br />Material weight: 2,900 lbs/LCY <br />Material description: Decomposed rock - 50% Rock, <br />50% Earth <br />Rated Payload: 52,800 pounds <br />Struck Volume: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$99.75 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$118.23 <br />NA <br />NA <br />NA <br />NA <br />NA <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$31.26 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$249.24 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$498.48 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $498.48 <br />MATERIAL OUANTITIES <br />Initial volume: 39,000 CCY Swell factor: 1.165 <br />Loose volume: 45,435 LCY <br />Source of estimated volume: Operator Estimate, minus 14,000 cy TR79/TR84 to Gob Pile <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraner Bowl (volume) Basis: <br />Material weight: 2,900 lbs/LCY <br />Material description: Decomposed rock - 50% Rock, <br />50% Earth <br />Rated Payload: 52,800 pounds <br />Struck Volume: <br />15.70 LCY <br />Heaped Volume: <br />22.00 LCY <br />Average Volume: <br />18.85 LCY <br />CIRCES Cost Estimating Software <br />