My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-01_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2017-03-01_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2017 6:33:12 AM
Creation date
3/2/2017 12:33:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
3/1/2017
Doc Name
Cost Estimate
From
Jason Musick
To
Clayton Wein
Type & Sequence
RN4
Email Name
JDM
CCW
JRS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 14 of 340 <br />HYDRAULIC EXCAVATOR WORK <br />Task description: Pull Back Material @ Old Truck Loadout Material Storage Area <br />Site: Bowie No. 2 Mine Permit Action: RN4 Permit/Job#: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 006 <br />Date: 3/1/2017 <br />7:13:03 AM <br />State: Colorado <br />County: Delta <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 365C L 13'-7" Stick <br />Attachment 1: ROPS Cab <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C083-006 <br />Horsepower: <br />404 <br />Weight (MT): <br />70.51 <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Utilization % <br />Ownership Cost/Hour: $109.56 NA <br />Operating Cost/Hour: $102.56 100 <br />Operator Cost/Hour: $37.79 NA <br />Total Unit Cost/Hour: $249.91 <br />Total Fleet Cost/Hour: $499.82 <br />MATERIAL QUANTITIES <br />Initial volume: 9,790 CCY Swell factor: <br />Loose volume: 11,405 LCY <br />Source of estimated volume: Page 3.02-2 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty): <br />Basic Job Condition Description: <br />Secondary Job Condition within Basic Description: <br />Cycle Time Value: <br />Load Bucket Capacity <br />1 1 CC <br />SEVERE <br />SEVERE <br />0.570 <br />minutes <br />Bucket Size Class: Small <br />Rated Capacity: 3.61 LCY (heaped) <br />Bucket Fill Factor: 0.850 Hard, tough clay (80% - 90%) 0.850 <br />Adjusted Capacity: 3.07 LCY <br />Job Condition Correction Factors Site Altitude: 6500 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: 323.00 <br />Adjusted Hourly Unit Production: 268.09 <br />Adjusted Hourly Fleet Production: 536.18 <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.