CHANGE SHEET FOR PERMIT REVISIONS, TECHNICAL REVISION, AND MINOR REVISIONS
<br />Mine Company Name: New Horizon North Mine Permit Number: C-2010-089
<br />Date: February 24, 2017 Revision Description: TR -15 Modifications to
<br />PMT & 2nd Park Lateral Pipeline Location
<br />Volume Page, Map or other Permit Entry to be Page, Map or other Permit Entry to be Description of Change
<br />Number
<br />REMOVED
<br />ADDED
<br />1
<br />N/A
<br />N/A
<br />No changes
<br />2
<br />Section 2.04.7: Hydrology Description, TOC (2 pages)
<br />Section 2.04.7: Hydrology Description, TOC (2 pages)
<br />Updated list of maps in table of contents
<br />2
<br />Map 2.04.7-1 Hydrologic Water Monitoring Locations
<br />Map 2.04.7-1 Hydrologic Water Monitoring Locations
<br />Updated annotation for 2nd Park Lateral Ditch
<br />2
<br />Map 2.04.7-9: 2nd Park Lateral Pipeline Location
<br />Map 2.04.7-9: 2nd Park Lateral Pipeline Location
<br />Updated 2nd Park Lateral postmining pipeline location
<br />3
<br />Map 2.05.3(3y3: Haul Road Alignment and Details
<br />Map 2.05.3(3)-3: Haul Road Alignment and Details
<br />Updated PMT, road profiles, and culvert sub -watersheds
<br />3
<br />Appendix 2.05.3(3)-1: SEDCAD Design for Culverts, Cover,
<br />Appendix 2.05.3(3)-1: SEDCAD Design for Culverts, Cover,
<br />Updated culvert designs for revised PMT
<br />1-42 43 panes)
<br />. 1-42 43 pages)
<br />Section 2.05.3(4): Ponds, Impoundments, Other Treatment
<br />Section 2.05.3(4): Ponds, Impoundments, Other Treatment
<br />Updated narrative to address 2nd Park Lateral ditch
<br />3
<br />Facilities and Diversions TOC . 5 2 pages)
<br />Facilities and Diversions TOC . 5 2 pages)
<br />relocation removed Appendix 2.05.3(4)-4 from TOC
<br />3
<br />Map 2.05.3(4)-1: Surface Water Hydrology
<br />Map 2.05.3(4)-1: Surface Water Hydrology
<br />I Updated PMT and pond sub -watersheds
<br />Appendix 2.05.3(4y2, SEDCAD Design Report, Pond NHN-
<br />Appendix 2.05.3(4)-2, SEDCAD Design Report, Pond NHN-
<br />Updated Pond NHN-003 SEDCAD for revised PMT and
<br />3
<br />003 SEDCAD Demonstrations 18 pages)
<br />003 SEDCAD Demonstrations 18 pages)
<br />sub -watersheds
<br />3
<br />App1 ndixages2.005.3(4)-4: CCC Ditch Relocation Report, Cover,
<br />N/A
<br />Removed Appendix 2.05.3(4)-4 from permit application
<br />Appendix 2.05.3(4)-6: Pond NHN-001 As -Built, Cover, pg. 1,
<br />Appendix 2.05.3(4)-6: Pond NHN-001 As -Built, Cover, pg. 1,
<br />Updated Pond NHN-001 SEDCAD demonstrations and as
<br />3
<br />SEDCAD Demonstrations 22 pages)
<br />SEDCAD Demonstrations 22 pages)
<br />built summary for revised PMT and sub -watersheds
<br />3
<br />Map 2.05.3(4)-6: Pond NHN-001 As -Built
<br />Map 2.05.3(4)-6: Pond NHN-001 As -Built
<br />Updated Pond NHN-001 stage storage curve information
<br />Appendix 2.05.3(4)-7: Pond NHN-001 Ditches As -Built,
<br />Appendix 2.05.3(4)-7: Pond NHN-001 Ditches As -Built,
<br />Updated Pond NHN-001 ditches SEDCAD and as -built
<br />3
<br />Cover TOC . 1-8 SEDCAD Demonstrations 28 pages)
<br />Cover TOC . 1-7 SEDCAD Demonstrations 27 pages)
<br />summary for revised PMT and sub -watersheds
<br />3
<br />Map 2.05.3(4)-7: Pond NHN-001 Ditches As -Built
<br />Map 2.05.3(4)-7: Pond NHN-001 Ditches As -Built
<br />Updated Pond NHN-001 ditches capacity evaluation
<br />Appendix 2.05.3(4)-8: Pond NHN-002 and Ditches, Cover,
<br />Appendix 2.05.3(4)-8: Pond NHN-002 and Ditches, Cover,
<br />Updated Pond NHN-002 and ditches SEDCAD and
<br />3
<br />TOC . 1-18 20 pages)
<br />TOC . 1-18 20 pages)
<br />design summary for revised PMT and sub -watersheds
<br />Updated Pond NHN-002 and ditches design information
<br />3
<br />Map 2.05.3(4)-9: Pond NHN-002 and Ditch Designs
<br />Map 2.05.3(4)-9: Pond NHN-002 and Ditch Designs
<br />for revised PMT and sub -watersheds
<br />Appendix 2.05.3(4)-10: Pond NHN-002 As -Built, Cover, pg.
<br />Appendix 2.05.3(4)-10: Pond NHN-002 As -Built, Cover, pg.
<br />Updated Pond NHN-002 SEDCAD demonstrations and as
<br />3
<br />1 SEDCAD Demonstrations 24 pages)
<br />1 SEDCAD Demonstrations 24 pages)
<br />built summary for revised PMT and sub -watersheds
<br />3
<br />Map 2.05.3(4)-10: Pond NHN-002 As -Built
<br />Map 2.05.3(4)-10: Pond NHN-002 As -Built
<br />jUpdated Pond NHN-002 stage storage curve information
<br />3
<br />Map 2.05.3(4)-11: Pond NHN-001 East Ditch Extension
<br />Map 2.05.3(4)-11: Pond NHN-001 East Ditch Extension
<br />jUpdated PMT
<br />Section 2.05.4: Reclamation Plan, Cover, TOC pp. 1-2 (4
<br />Section 2.05.4: Reclamation Plan, Cover, TOC pp. 1-2 (4
<br />Updated reclamation plan for current mine plan and
<br />4
<br />pages)
<br />a es)
<br />revised 2nd Park Lateral postmining pipeline location
<br />4
<br />Map 2.05.4-1: Reclaimed Land Contours & Cross -Sections
<br />Map 2.05.4-1: Reclaimed Land Contours & Cross -Sections
<br />Updated PMT and cross-sections, include cross-sections
<br />from Map 2.05.4-2
<br />4
<br />Map 2.05.4-2: Cross -Sections of Reclaimed Area
<br />N/A
<br />lConsolidated cross-section information to Map 2.05.4-1
<br />4
<br />Map 2.05.4(2xd)-1: Reclaimed Topsoil Thickness
<br />Map 2.05.4(2xd)-1: Reclaimed Topsoil Thickness
<br />Updated PMT
<br />4
<br />Appendix 2.05.4(2xe)-1: Irrigation Design, Cover, pp. 1-2 (3
<br />Appendix 2.05.4(2)(e)-1: Irrigation Design, Cover, pp. 1-2 (3
<br />Updated design for revised 2nd Park Lateral location
<br />pages)
<br />a es
<br />4
<br />Map 2.05.4(2)(ey1: Postmining Irrigation Design
<br />IMap 2.05.4(2xe)-1: Postmining Irrigation Design
<br />Updated PMT and 2nd Park Lateral location
<br />4
<br />1 Map 2.05.5-1: Postmining Land Use
<br />Map 2.05.5-1: Postmining Land Use
<br />Updated PMT
<br />
|