My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-23_PERMIT FILE - C1996084A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996084
>
2017-02-23_PERMIT FILE - C1996084A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2018 7:05:54 AM
Creation date
3/1/2017 9:03:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084A
IBM Index Class Name
Permit File
Doc Date
2/23/2017
Doc Name
pg 2.05-1 to 2.05-45a
Section_Exhibit Name
Section 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM FRX N0. 17198464975 Dec. 18 2003 09:23ftM PS <br />Rule 2 -Permits <br />• 2.05.3 OPERATIONS DESCRiPTIUN - FIVE VP:AR MINE PLAN <br />(]) Production Methods and Equipment -Second Permit Term <br />Map 2,05,3-2 details mining plans for the second five-year permit term. Only surface mitring <br />will occur during the second permit term in the northeast quadrant of the property. Mining will <br />commence in the northeast end of the ridge between Jeff Caziyon and Cow Canyon (Jeff Canyon <br />Surface Mine).. As shown by Map 2.05.3-1, the ridge will continue to be area mined over the <br />next 5-year permit term advancing from the northeast to the southwest. Support facilities include <br />a stockpile and loadout area (with crushing and stacking equipment) constructed adjacent to the <br />1Cem Valley Railroad (south side) that may be used for coal that can be direct shipped from the <br />mine site, haul and access roads, and portable office, warehousing and maintenance buildings. <br />All facilities and equipment to be constructed aztd operated are described in the sections below. <br />All coalbcd methane wells located in the mine disturbance will be avoided or plugged and <br />abandoned by the gas production company. <br />(2) Operation Description -Second Permit Term <br />Surtace Mine <br />. Surface mining activities began in 2001 in llte northeast portion of the mine area and proceeded <br />southwest (Map 2.05.3-Z). The area to be disturbed during the second permit term will be <br />cleared of trees/brush and topsoil will be salvaged and stored in stockpiles. Overburden and <br />interburden material will be moved to fill azeas or used as back fill for previous pits. Overburden <br />material will be moved by a combination of methods which will include dozers, loader and truck, <br />and cast blasting. Production benches for each major coal seam will be approximately 150 feet ui <br />width. A maximum of 1,500 linear feet of pit will be open at anyone time. <br />~~ <br />~~~ ~ ~~ <br />2,05-3 (Revised lU/29/0,) <br />
The URL can be used to link to this page
Your browser does not support the video tag.