Laserfiche WebLink
Other Reclamation Permits held by Prospective Successor(if applicable): <br /> North River Pit M-1999-005 Rocky Ford South Pit M-1977-222 <br /> LArMVZ Pt-4- H JAV-0 q 5WW-P Uftoe , Prf M 0-01 a 03c. <br /> J&fhl.e�1 P4 if t mao���25 ✓�-� a o��psi <br /> rn o a A cq 1 110 m "0 7•007 <br /> PrO&W p; t m a09q.0s4 <br /> 010044t 6 904 A 1Ae rA Pi+ N Z019-viy <br /> DESIGNATION OF REVIEW TIMELINE <br /> As explained above, the Permittee and Prospective Successor may waive their right to receive a <br /> decision on an Application within 30 days in order to allow the Division to calculate the required <br /> Financial Warranty before issuing its decision. Permittee and Prospective Successor must initial <br /> one of the following two options to designate their choice. If Permittee and Prospective <br /> z <br /> esso not a ee,the Division will render its decision within 30 days. <br /> 'I have reviewed the information provided in this Application <br /> F/ermrit-tell(� Packet, as well as the applicable Act and Rules. Having been fully <br /> V' informed, I wish to WAIVE MY RIGHT TO A DECISION ON <br /> Prospectiv Successor MY APPLICATION WITHIN 30 DAYS. <br /> I have reviewed the information provided in this Application <br /> Permittee Packet, as well as the applicable Act and Rules. Having been fully <br /> informed, I wish to MAINTAIN MY RIGHT TO A DECISION <br /> Prospective Successor ON MY APPLICATION WITHIN 30 DAYS. <br /> The Prospective Successor must provide an adequate Financial Warranty or conditional <br /> replacement Financial Warranty, consistent with the designation above. Hard Rock and <br /> Construction Materials Rule 4.3 describes the various acceptable types of Financial Warranties. <br /> Each Financial Warranty must be submitted on the Board's approved forms(available online at <br /> http: nnntins1.state.co.tis/Mineral"/o2UForms.him). <br /> - 6 - <br />