My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-24_PERMIT FILE - M2017007 (5)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017007
>
2017-02-24_PERMIT FILE - M2017007 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 6:35:35 AM
Creation date
2/27/2017 8:18:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017007
IBM Index Class Name
PERMIT FILE
Doc Date
2/24/2017
Doc Name
Application
From
Colorado Crushing, Inc.
To
DRMS
Email Name
ECS
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L <br /> RECLAMATION COSTS <br /> The following Reclamation Cost estimate is based on the <br /> assumption that there will be restricted no more than 20 . 0 acres ± <br /> of disturbance at any-one time, as shown on the Mining Plan Map. The <br /> mine working face will be 500 feet long by an average of 45 feet <br /> high and would need cut/fill sloped at 23 .47 yd/lft . Finish <br /> sloping on the 1200 feet of partially backfilled 2 : 1 slopes at <br /> 37 . 50 yd/lft to complete the 3 : 1 slope. The 20 acres will then be <br /> resoiled with an average of 3 inches of soil using a scraper to <br /> spread it and a blade to shape the seed bed. At that time we will <br /> have to respread 8, 070 cubic yards of topsoil and move 11, 715 cy of <br /> cut\fill sloping. The final backfill sloping and shaping on the <br /> exterior slopes will require moving 45, 000 cubic yards of material . <br /> The table below outlines the various areas of disturbance at the <br /> time explained above. A D8N dozer is used to do the cut/fill <br /> sloping, a 631G scraper will resoil and couplet bank sloping and a <br /> 140G Blade is used to shape the reclamation area. The mobilization <br /> haul distance is 12 . 0 miles at a average speed of 45 mph. The <br /> revegetation cost figure used includes fertilizer, grass seed, <br /> labor and drilling costs . <br /> STAGE TOTAL SOIL DEPTH <br /> NEEDING RESOILING 20.00 3 <br /> REVEGETATION AREA 20.00 <br /> RESOIL @ 3,' B4O70 CUBIC YARDS <br /> CUT/FILL SLOPING 1 1 ,71 5 CUBIC YARDS <br /> BACKFILL SLOPING 45,000 CUBIC YARDS <br /> ESTIMATED UNIT COSTS FOR RECLAMATION ITEMS: <br /> Unit Cost <br /> 1. Revegetation areas includes grass seed, fertilizer <br /> and labor to drill . . . . . . . . . . . . . . . . . $ 650.00/AC. <br /> 2 . Re-spreading soil and/or growth media with <br /> 631G Scraper, haul distance 600 ft or less . . . . . . . . . . . $ 0.388/YD3 1/ <br /> 3 . Cut/fill working face 400 feet long by 20 feet high <br /> D-8 Dozer, push distance 135 ft or less . . . . . . . . . . . . $ 0.53/YD3 1/ <br /> 4 . Backfill and shape 1200 feet long part reclaimed slope <br /> 631G Scraper, haul distance 300 ft or less . . . . . . . . . . . $ 0.539/YD3 1/ <br /> 5 . Shape seedbed 140G Blade at 2.11 acres per hour . . . . . . . . $ 59.54/AC 1/ <br /> RECLAMATION COSTS <br /> 1. Revegetation, 20.00 ac @ $650. 00/ac $13, 000.00 <br /> la. Secondary revegetation 20.00 ac @ 25% * $325.00/ac 3, 250.00 <br /> 2 . Resoiling, 8, 070 yd3 @ 38. 8/yd3 3, 129.42 <br /> 3 . Cut/fill highwall 11,750 yd3 @ 53�/yd3 6, 172 .33 <br /> 4 . Backfill slope 45, 000 yd3 @ 53 .9� /yd3 24,237.51 <br /> 5 . Shape seed bed 20.00 acres @ $59.54/ac 1, 90.72 <br /> Net Total $55, 979.97 <br /> 6 . Indirect costs <br /> Mobilization 5, 935 .30 <br /> Insurance, Bond, Management& Profit 5, 598 .00 <br /> 7 . Administration costs _ 3, 177.42 <br /> TOTAL ESTIMATE $72, 661.19 <br /> Recommend bond be set at $72,700.00 <br /> 54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.