My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-24_PERMIT FILE - M2017007 (5)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017007
>
2017-02-24_PERMIT FILE - M2017007 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 6:35:35 AM
Creation date
2/27/2017 8:18:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017007
IBM Index Class Name
PERMIT FILE
Doc Date
2/24/2017
Doc Name
Application
From
Colorado Crushing, Inc.
To
DRMS
Email Name
ECS
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION PLAN EXHIBIT E (CONT) <br /> stockpiles around the perimeter of the mined area or direct <br /> placement on the final slopes as stripping takes place helps <br /> reduce the cost to reclaim the site if mining ended midway thru <br /> the site . It also means that the topsoil, only has to be handled <br /> once and reclamation will run concurrent with mining. <br /> There are sufficient amounts of topsoil on the site so the <br /> mined area can be resoiled to a maximum average depth of three <br /> (3) inches . Additional growth medium (processing fines) will be <br /> salvaged during processing to supplement the topsoil if needed. <br /> All topsoil encountered will be saved from the stripping process <br /> and the operator will not haul additional soils onto the site for <br /> revegetation. Existing soils in place have been capable of <br /> producing a sparse cover of grasses suitable for grazing purposes <br /> when not abused. The vegetation information was obtained from <br /> site visits and data provided in the vegetation information <br /> obtained from the NRCS soil survey web page . A copy if that <br /> report is in EXHIBIT'S I and J and describes the current cover in <br /> the terms of yearly production and will serve as background <br /> information as reclamation progresses . Our site specific <br /> investigations suggest the range quality is on the average side . <br /> As outlined in the MINING PLAN, up to 90 . 26 acres ± of the <br /> permitted area will be disturbed as a result of mining. Since <br /> there are no stages in the permit, reclamation will run <br /> concurrent with mining. The plan calls for having no more than <br /> 20 . 0 acres ± disturbed at any-one-time . As mining progresses <br /> across the property some parts of the property will remain <br /> undisturbed while other areas will be either stripped, mined, <br /> partially reclaimed or totally reclaimed. The MINING PLAN MAP - <br /> EXHIBIT C-1 shows how the pit will look when approximately 38% is <br /> stripped, mined and partially reclaimed. The RECLAMATION PLAN <br /> MAPS - EXHIBIT F-1, & F-2 show how the area will look when <br /> reclamation is complete depending on what option is used. The <br /> area will be returned to at least it ' s present vegetative <br /> condition when reclamation is complete . <br /> Careful analysis of the growth medium and salvaged soil will <br /> permit the operator to carry out a soil additive program and to <br /> monitor the prescribed seeding plan and to determine if the plan <br /> requires revision. Under normal weather conditions, an adequate <br /> moisture reserve will be present for establishment of the <br /> proposed seed mixture . No irrigation is planned for this site <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.