Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk Pond 6 <br />NPDES ID. No.: None <br />Inspection Period: First Quarter 2017 <br />Inspection Date: 02/21/17 <br />General Description or Reference to Site Plan: <br />Pond 6 is a non -discharging facility designed to contain plant processing water. The plant has <br />been idle since 1996 and the pond is now used to dewater other ponds prior to clean-out. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />Excellent Moderate( Few Poor <br />Extensive Some Cew None <br />4). Erosion of the downstream toe of the embankment? <br />Cause of erosion can be attributed to: <br />Yes <br />Yes <br />No L_ <br />No (---- <br />5). Is seepage occurring through the dam? Yes No <br />Could this seepage cause potential instability? <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />{� YCExplain: �✓ti3 <br />OTHER OBSERVATIONS: <br />No 4� <br />MSHA Trained Impoundme t Inspector <br />February 22, 2017 <br />