Laserfiche WebLink
NEWMONT <br />16 February 2017 <br />RECEIVED <br />FEB 22 2017 <br />DMSION OF RECLAMATION <br />MINING AND SAFETY <br />Newmont Mining Corporation <br />Crappie CreeM & Victor Gold Mining Company <br />10aN3''S4 <br />PO Box 191 <br />Victor CO 90860 <br />wwvo newmosat-cern <br />SENT CERTIFIED, RETURN RECEIPT REQUESTED <br />7015-1660-0000-0779-8591 <br />Mr. Timothy Cazier, P.E. <br />Environmental Protection Specialist <br />Colorado Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Permit No. M-1980-244; Cripple Creek & Victor Gold Mining Company (°_CC&V�); <br />Cresson Proiect; — Follow Up Report to High Grade Mill (HGM) High PH Thickener <br />Overflow tank overtoppinq event, February 11, 2017 <br />Dear Mr. Cazier: <br />In accordance with Rule 8, Section 8.2.3 of the Hard Rock, Metal and Designated Mining <br />Operations Regulations (2015), CC&V hereby provide the Division with a formal report <br />regarding the 2500 gallon process water release that occurred at operation on 11"' February <br />2017. <br />Miscommunication during event reporting between operations and environment personnel <br />resulted in an incorrect tank reference and location initially being reported to the Division. The <br />correct tank reference is the High pH Thickener overflow tank and is shown as Figure 1, within <br />Attachment 1 and Figure 2 in Attachment 2. <br />The following points addresses the requirements as outlined within Rule 8, Sub section <br />8.2. <br />a. Actions taken to respond to and correct the emergency situation or condition <br />At approximately 2:00am, 2500gal of High pH water, measuring 200ppm WAD CN, <br />overtopped the High pH Thickener overflow tank at the High Grade Mill Facility. <br />Adjustments were made to the processing circuit to prevent the tank from overflowing <br />further. Flow from the circuit feeding the affected area was shut off until control could be <br />regained. The full Mill circuit was also shut down until control of the plant could be <br />regained. <br />Communication was made to the Mill General Foreman, Process Superintendent and <br />the Environmental representative on call. <br />